Home
PROJECT PERFORMANCE INTERNATIONAL
SE Goldmine
Helping projects succeed ...

Systems Engineering NEWSLETTER

SyEN makes informative reading for the project professional, containing scores of news and other items summarizing developments in the field of systems engineering and in directly related fields.


  • SE Goldmine Home
  • Documents
  • Standards
  • Organizations
  • Register
  • Login
  • About PPI
  • On-site Training
  • Email PPI
  • Contact PPI
  • PPI home
Home › SE Standards › US Mil Stds, Hdbks etc (Verif) ›

Standard: MIL-STD-881A - Work Breakdown Structures for Defense Materiel Items

Status (as a standard)
status: 
replaced
Defining document(s)
Document titlesort icon Identifier Document date Status Size Files
MIL-STD-881A - Work Breakdown Structures for Defense Materiel Items MIL-STD-881A 1975-04-25 replaced 5.08 MB DOWNLOAD!
Supersedes standard(s)
Standard: MIL-STD-881 - Work Breakdown Structures for Defense Materiel Items
Related organizations
U.S. Department of Defense (DoD)
Documents
Document Titlesort icon Document Identifier Document Date Size File
MIL-STD-881A - Work Breakdown Structures for Defense Materiel Items MIL-STD-881A 1975-04-25 5.08 MB DOWNLOAD!
External documents
  • MIL-STD-881A - Work Breakdown Structures for Defense Materiel Items
‹ MIL-STD-881 up MIL-STD-881A - Work Breakdown Structures for Defense Materiel Items ›
  • Printer-friendly version

Search SE Goldmine

SE Goldmine menu

  • Project Performance International (PPI)
    • Biographies
      • Bios: Robert Halligan
        • Bio: Robert Halligan - RA - International Biography
        • Bio: Robert Halligan - SE - Australian Defence
        • Bio: Robert Halligan - SE - International Defence
        • Bio: Robert Halligan - SE - International General
        • Bio: Robert Halligan: Portuguese
      • Bio: Andrew Gabb
      • Bio: Greg Northover
    • Commendations
      • Commendation: Glidepath
      • Commendation: INCOSE President and INCOSE Silver State Chapter President
      • Commendation: RAAF Staff College
    • Consulting
      • Consultancy Brochure
    • Courses
    • PPI In-House Training
  • Systems Engineering
    • SE Introduction
      • An Introduction to Systems Engineering
    • SE Diagrams, Languages & Models
      • Integration Definition (IDEF)
        • Methodology: Integration Definition (IDEF)
          • Methodology: IDEF0 Functional Modeling
          • Methodology: IDEF1 Information Modeling
          • Methodology: IDEF1X Information Modeling
          • Methodology: IDEF2 Simulation Model Design
          • Methodology: IDEF3 Process Description Capture
          • Methodology: IDEF4 Object-Oriented Design
          • Methodology: IDEF5 Ontology Description Capture
          • Methodology: IDEF6 Design Rationale Capture
          • Methodology: IDEF8 Human-System Interaction Design
          • Methodology: IDEF9 Business Constraint Discovery
          • Methodology: IDEF14 Network Design Method
        • IDEF1 Information Modeling - Part 1
        • IDEF1 Information Modeling - Part 2
        • Information Integration for Concurrent Engineering (IICE) IDEF4 Object-Oriented Design Method Report
          • Illustrates the subclass/superclass relation between classes.
        • Information Integration for Concurrent Engineering (IICE) IDEF5 Method Report
        • Information Integration for Concurrent Engineering (IICE) Toward a Method for Business Constraint Discovery (DEF9)
        • Information Integration for Concurrent Engineering (IICE): Compendium of Methods Report
        • Integration Definition for Concurrent Engineering (IICE) IDEF3 Process Description Capture Method Report
        • Integration Definition for Function Modeling (IDEF0)
        • Integration Definition for Information Modeling
      • Requirements Analysis Modeling
      • SE Process Diagrams
      • Statecharts
        • Executable Object Modeling with Statecharts
      • System Engineering Concept Demonstration Process Model SECD PM Version 10.0
        • README_FIRST
        • SECD PM Version 10.0: application
      • Unified Modeling Language (UML)
        • Assessing the Suitability of UML for Capturing and Communicating Systems Engineering Design Models
        • Problems and Deficiencies of UML as a Requirements Specification Language
        • SE UML
          • Requirements Analysis For Systems Engineering (SE) UML (Draft V0.4)
          • SE Concept Model Comparison
          • SE DSIG STATUS (Jan 21, 2003)
          • SE Evaluation Definitions Rev0.2
          • SE UML definitions ReviewB
          • SEDSIG SE Prototype Team - OMG Workshop, Orlando FL
          • Systems Engineering (SE) UML Requirements - DRAFT
          • UML systems engineering flow
          • UML™ Profile for Systems Engineering, Request For Proposal, Draft (January 20, 2003)
    • SE Education
      • Defense Acquisition University (DAU) USA
        • DAU Administrative Information
        • DAU Assignment-Specific Training
        • DAU Campuses
        • DAU Career Field Descriptions
        • DAU Certification Standards Checklists
        • DAU College Program Equivalencies
        • DAU Continuing Education Units
        • DAU Course Descriptions
        • DAU Meeting Acquisition Corps Education Standards
        • DoD School Equivalencies
        • DoD/DAU Leadership
      • Portland State University - Systems Engineering Course Brochure
      • RMIT Systems Engineering Details
      • Summary of Systems Engineering University Courses
      • University of Idaho - Online Graduate SE Courses
    • SE Events
    • SE Principles
      • Discussion: Knowledge Management (KM)
      • Principles in the Engineering of Systems
      • Principles of Requirements Engineering
      • Ten Common Misunderstandings; Three Uncommon Understandings
      • Types of Requirements
    • SE Research
      • Dr Didar Zowghi's Home Page
    • SE Failures
      • Example Failures for Requirements
      • Rescuing Prometheus
      • The Reality of Development
    • SE Successes
      • Value of Systems Engineering
      • Value of Systems Engineering : SECOE Research Project Progress Report
      • Value of Systems Engineering: Summary Report
    • Links
  • Professional Societies
    • The Requirements Engineering Specialist Group Membership Form 2003
  • SE Software Tools
    • Cost/Schedule Control Exercise Worksheet
    • FRED Requirements Tool
    • Information
      • Analytica (Influence Diagrams)
      • ARM Requirements Tool - Automated Quality Analysis of Natural Language Requirement Specifications
      • Compendium of SE Related Tools (Obsolete)
      • Cost Analysis Strategic Assessment (CASA)
      • DOORS/Analyst™ Visualize Requirements inside Telelogic DOORS®
      • ECOM: ESA's Cost Modeling Software
      • Expert Choice: Product Brief
      • Lumina Decision Systems
      • ProRisk: Professional Risk Analysis
      • Tendeval
        • Tendeval: Standard Pricing Schedule
        • Tendeval: Tender Evaluation Software Description
      • Vensim
    • MindManager Personal
    • Parametric Life Cycle Costing (PLCC) LCC Model
    • Project X SE Cost and Schedule Estimate Example Using COSYSMO v1.14
    • REQUALTE RQM TOOL
      • Requalte Requirements Tool
      • Requirement Quality Metrics
    • Requirements Management FileMaker Pro Demo
    • SWECOCO
  • INCOSE
    • INCOSE Individual Membership Application
    • INCOSE Liason Relationships with Standard Activities
    • INCOSE Mailing Lists
    • INCOSE Symposium 2004
    • Publication Order Form
  • Bibliographies and Reviews
    • Good Books
    • Systems Engineering Process: a Technical Bibliography
  • SE Standards
    • Data Item Descriptions (DIDs)
      • Aus DoD DIDs
        • Data Item Description - Technical Document Tree VA (SMART20)
        • Data Item Description - Technical Document Tree VB
        • Data Item Description: Operational Concepts Document
        • DID-ENG-DEF-OCD-VG (OCD)
          • Comments on OCD Guidance
          • DID-ENG-DEF-OCD-VG - Operational Concept Document
        • DID-ENG-DEF-TCD-VA - Test Concept Document (TCD)
        • Guidance for the Preparation of an OCD, FPS and TCD
      • DIDs Listings
        • Commonly Used DIDs
        • DD Form 1423 CDRL: For Supplies and Services type contracts
      • Other DIDs
        • EIA-632 SEMP Template
        • SMAP-DID-P100 - Concept Data Item Description
        • SMAP-DID-P200-SW - Software Requirements - Data Item Description
        • SMAP-DID-P200-SY - Information Systems Requirements - Data Item Description
      • PPA DIDs
        • DID Requirements Database (RDB)
        • ENGINEERING CHANGE PROPOSAL
        • INTEGRATED LOGISTIC SUPPORT PLAN (ILSP)
        • List of PPA DIDs
        • MASTER LIST OF CONTRACT DATA REQUIREMENTS LIST (CDRL) AND DATA ITEM DESCRIPTIONS (DIDs)
        • PPA-003461 - System/Subsystem Design Description (SSDD)
        • PPA-003914-1 - Verification Requirements Specification (VRS)
        • PPA-004023-1 - Concept of Operations (CONOPS)
        • PPA-ME04-000950-6 - Operational Concept Description (OCD)
        • PPA-ME04-000953-4 - Statement of Work (SOW)
        • PPA-ME04-002234-3 - Interface Requirements Specification (IRS)
        • PPA-ME04-002235-4 - System Requirements Specification (SyRS)
        • PPA-ME04-002236-1 - Task Specification (TS)
        • PPA-ME04-002237-3 - Software Requirements Specification (SRS)
        • PPA-ME04-002588-01 - Operational and Support Concept Description (O&SCD)
        • PRINCE2 Project Organisation Template
        • TAA-ME04-000905-10 - Systems Engineering Management Plan (SEMP)
        • TAA-ME04-000906-3 - Software Development Plan (SDP)
        • TAA-ME04-000907-4 - Project Plan
        • TAA-ME04-000933-2 - Logistics Support Analysis Plan (LSAP)
        • TAA-ME04-001110-3 - Software Independent Verification and Validation Plan (SIV&VP)
        • TAA-ME04-001129-1 - Software Installation Plan (SIP)
        • TAA-ME04-001130-1 - Software Transition Plan (STrP)
        • TAA-ME04-001132-1 - Software Design Description (SDD)
        • TAA-ME04-001133-1 - Interface Design Description (IDD)
        • TAA-ME04-001134-1 - Database Design Description (DBDD)
        • TAA-ME04-001135-1 - Software Test Plan (STP)
        • TAA-ME04-001136-1 - Software Test Description (STD)
        • TAA-ME04-001137-1 - Software Test Report (STR)
        • TAA-ME04-001138-1 - Software Product Specification (SPS)
        • TAA-ME04-001139-1 - Software Version Description (SVD)
        • TAA-ME04-001140-1 - Software User Manual (SUM)
        • TAA-ME04-001141-1 - Software Centre Operator Manual (SCOM)
        • TAA-ME04-001142-1 - Software Input/Output Manual (SIOM)
        • TAA-ME04-001143-1 - Computer Operation Manual (COM)
        • TAA-ME04-001144-1 - Firmware Support Manual (FSM)
        • TAA-ME04-001145-1 - Computer Programming Manual (CPM)
        • TAA-ME04-001208-1 - Engineering Change Proposal (ECP)
      • US DoD DIDs
        • DA-A-5613 - PERT/TIME NETWORK DIAGRAM
        • DI-CMAN-490NXXX - PROCESS SPECIFICATION (PS)
        • DI-CMAN-490OXXX - Material Specification (MS)
        • DI-CMAN-80008 - System/Segment Specification
        • DI-CMAN-80008A - System/Segment Specification
        • DI-CMAN-80405 - Configuration Management Plan (CMP)
        • DI-CMAN-80534 - System/Segment Design Document (SSDD)
        • DI-E-2035B - Configuration Management Plan (CMP)
        • DI-E-5550 - System/System Segment Interface Control Document
        • DI-E-7144
        • DI-H-7051 - Human Engineering Program Plan (HEPP)
        • DI-H-7052 - Human Engineering Dynamic Simulation Plan (HEDSP)
        • DI-H-7053 - Human Engineering Test Plan (HETP)
        • DI-H-7054 - Human Engineering System Analysis Report (HESAR)
        • DI-H-7055 - Critical Task Analysis Report
        • DI-H-7058 - Human Engineering Test Report (HETR)
        • DI-H-7059 - Human Engineering Progress Report
        • DI-ILSS-80095 - Integrated Logistics Support Plan (ILSP)
        • DI-ILSS-80395 - Integrated Support Plan (ISP)
        • DI-ILSS-80531
        • DI-IPSC-80689
        • DI-IPSC-80690
        • DI-IPSC-80694
        • DI-IPSC-81430 - Operational Concept Description (OCD) [as PDF scan]
        • DI-IPSC-81431 - System/Subsystem Specification (SSS) [as PDF scan]
        • DI-IPSC-81431A - System/Subsystem Specification (SSS) [as PDF scan]
        • DI-IPSC-81433 - Software Requirements Specification (SRS) [as PDF scan]
        • DI-IPSC-81434 - Interface Requirements Specification (IRS) [as PDF scan]
        • DI-IPSC-81434A - Interface Requirements Specification (IRS)
        • DI-IPSC-81436 - Interface Design Description (IDD) [as PDF scan]
        • DI-L-30325
        • DI-L-4610 - Report, Level of Repair Analysis Input Data
        • DI-L-6138
        • DI-MCCR-80019A - Software User's Manual (SUM)
        • DI-MCCR-80023 - Operational Concept Document (OCD)
        • DI-MCCR-80025A - Software Requirements Specification (SRS)
        • DI-MCCR-80026
        • DI-MCCR-80026A - Interface Requirements Specification (IRS)
        • DI-MCCR-80027A - Interface Design Description (IDD)
        • DI-MCCR-80303
        • DI-MCCR-80313
        • DI-MCCR-80314
        • DI-MCCR-80315
        • DI-MGMT-81024 - Systems Engineering Management Plan (SEMP)
        • DI-MISC-80526 - Parts Control Program Plan (PCPP)
        • DI-NDTI-80566 - Test Plan
        • DI-QCIC-80510 - Installation Specification
        • DI-QCIC-80511 - Installation Test
        • DI-QCIC-80553 - Acceptance Test Plan
        • DI-R-1724 - Quality Inspection Test, Demonstration and Evaluation Report
        • DI-R-1772-CAVR - Configuration Audit Validation Report
        • DI-R-21597 - Failure Reporting, Analysis, and Corrective Action System (FRACAS) Plan
        • DI-R-3549A - Repair Level Analysis Reports (RLA)
        • DI-R-7079 - Reliability Program Plan
        • DI-S-30551A
        • DI-S-30551B - System/Subsystem Specification (SS)
        • DI-S-3404-FBD - Functional Flow Diagram
        • DI-S-3561B
        • DI-S-3604
        • DI-S-3605
        • DI-S-3606
        • DI-S-3607
        • DI-S-3608
        • DI-S-3618/S-152 - System Engineering Management Plan (SEMP)
        • DI-S-6173
        • DI-S-6174B - Facilities Design Criteria
        • DI-S-6175
        • DI-SAFT-80100 - System Safety Program Plan (SSPP)
        • DI-SAFT-80101B
        • DI-SAFT-80102B
        • DI-SAFT-80103B
        • DI-SAFT-80104B
        • DI-SAFT-80105B
        • DI-SAFT-80106B
        • DI-SAFT-80XXX - System Safety Program Report (SSPR)
        • DI-SAFT-81299A
        • DI-T-5147
        • MIL-STD-498 DIDs
          • MIL-STD-498 DIDs [as PDFs]
            • DI-IPSC-81427 - Software Development Plan (SDP) [as PDF]
            • DI-IPSC-81428 - Software Installation Plan (SIP) [as PDF]
            • DI-IPSC-81429 - Software Transition Plan (STrP) [as PDF]
            • DI-IPSC-81430 - Operational Concept Description (OCD) [as PDF]
            • DI-IPSC-81431 - System/Subsystem Specification (SSS) [as PDF]
            • DI-IPSC-81432 - System/Subsystem Design Description (SSDD) [as PDF]
            • DI-IPSC-81433 - Software Requirements Specification (SRS) [as PDF]
            • DI-IPSC-81434 - Interface Requirements Specification (IRS) [as PDF]
            • DI-IPSC-81435 - Software Design Description (SDD) [as PDF]
            • DI-IPSC-81436 - Interface Design Description (IDD) [as PDF]
            • DI-IPSC-81437 - Database Design Description (DBDD) [as PDF]
            • DI-IPSC-81438 - Software Test Plan (STP) [as PDF]
            • DI-IPSC-81439 - Software Test Description (STD) [as PDF]
            • DI-IPSC-81440 - Software Test Report (STR) [as PDF]
            • DI-IPSC-81441 - Software Product Specification (SPS) [as PDF]
            • DI-IPSC-81442 - Software Version Description (SVD) [as PDF]
            • DI-IPSC-81443 - Software User Manual (SUM) [as PDF]
            • DI-IPSC-81444 - Software Center Operator Manual (SCOM) [as PDF]
            • DI-IPSC-81445 - Software Input/Output Manual (SIOM) [as PDF]
            • DI-IPSC-81446 - Computer Operation Manual (COM) [as PDF]
            • DI-IPSC-81447 - Computer Programming Manual (CPM) [as PDF]
            • DI-IPSC-81448 - Firmware Support Manual (FSM) [as PDF]
          • DI-IPSC-81427 - Software Development Plan (SDP)
          • DI-IPSC-81428 - Software Installation Plan (SIP)
          • DI-IPSC-81429 - Software Transition Plan (STrP)
          • DI-IPSC-81430 - Operational Concept Description (OCD)
          • DI-IPSC-81431 - System/Subsystem Specification (SSS)
          • DI-IPSC-81432 - System/Subsystem Design Description (SSDD)
          • DI-IPSC-81433 - Software Requirements Specification (SRS)
          • DI-IPSC-81434 - Interface Requirements Specification (IRS)
          • DI-IPSC-81435 - Software Design Description (SDD)
          • DI-IPSC-81436 - Interface Design Description (IDD)
          • DI-IPSC-81437 - Database Design Description (DBDD)
          • DI-IPSC-81438 - Software Test Plan (STP)
          • DI-IPSC-81439 - Software Test Description (STD)
          • DI-IPSC-81440 - Software Test Report (STR)
          • DI-IPSC-81441 - Software Product Specification (SPS)
          • DI-IPSC-81442 - Software Version Description (SVD)
          • DI-IPSC-81443 - Software User Manual (SUM)
          • DI-IPSC-81444 - Software Center Operator Manual (SCOM)
          • DI-IPSC-81445 - Software Input/Output Manual (SIOM)
          • DI-IPSC-81446 - Computer Operation Manual (COM)
          • DI-IPSC-81447 - Computer Programming Manual (CPM)
          • DI-IPSC-81448 - Firmware Support Manual (FSM)
        • UDI-E-20235 - Specification Tree
        • UDI-E-23974 - Systems Engineering Management Plan (SEMP)
        • [DRAFT] - Interface Requirements Specification (IRS) [as PDF scan]
        • [DRAFT] - Operational Concept Description (OCD) [as PDF scan]
        • [DRAFT] - Software Requirements Specification (SRS) [as PDF scan]
        • [DRAFT] - Software User's Manual (SUM)
        • [DRAFT] - System/Subsystem Specification (SSS) [as PDF scan]
    • BSI Standards
      • BS 5760 - Reliability of systems, equipment and components
      • BS 6001 - Sampling procedures for inspection by attributes
    • EIA Standards
      • Standard: ANSI/EIA-632 - Processes for Engineering a System
        • Evolution of EIA 632 from an Interim Standard to a Full Standard
        • Overview of the EIA 632 Standard: Processes for Engineering a System
        • Overview of the EIA 632 Standard: Processes for Engineering a System (TUTORIAL G)
        • Standards Review of ANSI/EIA-632
      • Standard: EIA-649 Configuration Management
        • ANNOUNCEMENT: New EIA Standards to Address Data Interoperability and Configuration Management
        • Presentation: MIL-HDBK-61 vs. EIA-649
      • Standard: EIA/IS 632 - Systems Engineering
      • Standard: EIA/IS-731: Systems Engineering Capability Model
        • EIA/IS-731.1 - Systems Engineering Capability Model - Intro - DUPLICATE
        • EIA/IS-731.1 - Systems Engineering Capability Model: DUPLICATE
        • EIA/IS-731.2 - Systems Engineering Capability Model Appraisal Method - DUPLICATE
        • EIA/IS-731.2 - Systems Engineering Capability Model Appraisal Method - Intro - DUPLICATE
        • Letter: Status of EIA/IS-731 (and transition to the CMMI)
        • Mapping from EIA/ANSI 632 to EIA/IS 731
    • IEEE Standards
      • A Comparison of IEEE/EIA 12207, ISO/IEC 12207, J-STD-016, and MIL-STD-498 for Acquirers and Developers
      • Comparison of IEEE Std 1220-1994 to IEEE Std 1220-1998
      • Standard: IEEE 1220 - IEEE Trial-Use Standard for Application and Management of the Systems Engineering Process
      • Standard: IEEE Std 1220-1998 IEEE Standard for Application and Management of the Systems Engineering Process
        • IEEE Std 1220-1998 IEEE Standard for Application and Management of the Systems Engineering Process -Description
        • IEEE Std 1220-1998 IEEE Standard for Application and Management of the Systems Engineering Process -Description
      • Standard: IEEE Std 1220-2005 IEEE Standard for Application and Management of the Systems Engineering Process
        • IEEE Std 1220-2005 IEEE Standard for Application and Management of the Systems Engineering Process
      • Standard: IEEE/EIA 12207 - Information technology - Software life cycle processes
        • IEEE/EIA 12207-2008 - Standard for Information Technology - Software Life Cycle Processes
        • IEEE/EIA 12207.0-1996 - Standard for Information Technology - Software Life Cycle Processes
        • IEEE/EIA 12207.1-1997 - Guide for ISO/IEC 12207, Standard for Information Technology - Software Life Cycle Processes - Life cycle data
        • IEEE/EIA 12207.2-1997 - Guide for ISO/IEC 12207, Standard for Information Technology - Software Life Cycle Processes - Implementation considerations
      • Standard: US 12207 (1996+)
    • ISO Standards
      • Stages of Dev of ISO Stds
      • Standard: AP-233 (Application Protocol 233)
        • AP-233 Overview
        • Support for Object-Orientation in AP-233
      • Standard: BS EN ISO 9000:2000
      • Standard: ISO 10005 Guidelines for Quality Assurance Plans.
      • Standard: ISO 15288
      • Standard: ISO 8402 Quality Management and Quality Assurance - Quality Vocabulary
      • Standard: ISO 9000
      • Standard: ISO 9001
      • Standard: ISO/IEC 20926 - Software engineering -- IFPUG 4.1 Unadjusted functional size measurement method -- Counting practices manual
        • IFPUG Glossary ISO/IEC 20926:2003(E)
        • ISO/IEC 20926:2003(E)
        • ISO/IEC 20926:2009
      • Standard: STEP (ISO 10303)
    • NASA SE Standards
    • OMG SE Standards
      • Standard: Systems Modeling Language (SysML)
    • Other SE Standards
      • ADFP 102 Service Writing (Aus)
        • ADFP102 — Defence Writing Standards: selected chapters combined
      • Australian Army Configuration Management Manual (CMMAN)
      • Configuration Management - MINE WARFARE-STD-973
      • DEFPUR 301 - Proforma RFT
        • Consultancy/Professional services - Part 2 - Conditions of Tender
        • Short Form Contract for Consultancy/Professional Services
        • Statement of Requirement (SOR) For The Provision Of Consultancy/Professional Services
          • The title of the Services and a detailed Statement of Requirement for the work to be undertaken should be included in this Attachment.
      • DR5679 V2.0 Safety Critical Sy
      • FIPS PUB
        • Guidelines for Documentation of Computer Programs and Automated Data Systems
      • Supportability Performance Standard: SAE+SOLE
      • Systems Engineering - MINE WARFARE-STD-499B
      • Work Breakdown Structures for Defense Material Projects - Policy and Guidance
      • Work Breakdown Structures for Defense Material Projects - Policy and Guidance
    • SAE standards
      • ARP4754 - Certification Considerations for Highly-integrated or Complex Aircraft Systems
    • SE Standards Organisations
      • Standards Organizations USA: Appendix C: Document Sources
    • Standards Comparisons & Guidance
      • Comparison of ANSI/EIA-632-1988 to ISO/IEC-15288
      • Comparison of standards ANSI/EIA-632-1988 to ISO/IEC-15288
      • Concepts of ANSI/EIA-632-1988 to ISO/IEC-15288
      • Figure 17. Mapping of MIL-STD-498 DIDs to DOD-STD-2167A and DOD-STD-7935A DIDs
      • Guide to Selection and Application of Software Engineering Standards
      • Heritage of Systems Engineering Standards
      • Mapping from EIA/ANSI 632 to DOD 5000.2-R
      • THE ASSESSMENT OF CMMI-SE/SW V.1.0 TO ISO/IEC 15288 CD2 Requirements
    • Standards Listings
      • Human Factors Standards & Handbooks
      • IEEE Software Engineering Standards Collection
      • SYSTEM Engineering & Software Engineering Standards and Models
    • UK DEFSTANs
      • Standard: Def Stan 00-17: "Modular Approach to Software Construction, Operation and Test - MASCOT"
        • Def Stan 00-17/1 - Modular Approach to Software Construction, Operation and Test - MASCOT
      • Standard: Def Stan 00-25: "Human Factors for Designers of Equipment": Pts 15-21 & 25
        • Def Stan 00-25 Pts 15-21 & 25
      • Standard: Def Stan 00-25: "Human Factors for Designers of Equipment": Pts 1-13
        • Def Stan 00-25: "Human Factors for Designers of Equipment": Part No: 1: Introduction
        • Def Stan 00-25: "Human Factors for Designers of Equipment": Part No: 2: Body Size
        • Def Stan 00-25: "Human Factors for Designers of Equipment": Part No: 3: Body Strength and Stamina
        • Def Stan 00-25: "Human Factors for Designers of Equipment": Part No: 4: Workplace Design
        • Def Stan 00-25: "Human Factors for Designers of Equipment": Part No: 5: Stresses and Hazards
        • Def Stan 00-25: "Human Factors for Designers of Equipment": Part No: 6: Vision and Lighting
        • Def Stan 00-25: "Human Factors for Designers of Equipment": Part No: 7: Visual Displays
        • Def Stan 00-25: "Human Factors for Designers of Equipment": Part No: 8: Auditory Information
        • Def Stan 00-25: "Human Factors for Designers of Equipment": Part No: 9: Voice Communication
        • Def Stan 00-25: "Human Factors for Designers of Equipment": Part No: 10: Controls
        • Def Stan 00-25: "Human Factors for Designers of Equipment": Part No: 11: Design for Maintainability
        • Def Stan 00-25: "Human Factors for Designers of Equipment": Part No: 12: Systems
        • Def Stan 00-25: "Human Factors for Designers of Equipment": Part No: 13: Human Computer Interaction
      • Standard: Def Stan 00-35: "Environmental Handbook for Defence Materiel" Pts 1 - 5 (& 6)
        • Def Stan 00-35: "Environmental Handbook for Defence Materiel": Part No: 1: Control and Management: Issue 3
        • Def Stan 00-35: "Environmental Handbook for Defence Materiel": Part No: 1: Control and Management: Issue 4
        • Def Stan 00-35: "Environmental Handbook for Defence Materiel": Part No: 2: Environmental Trials Programme Derivation and Assessment Methodologies: Issue 4
        • Def Stan 00-35: "Environmental Handbook for Defence Materiel": Part No: 3: Environmental Test Methods: Issue 3
        • Def Stan 00-35: "Environmental Handbook for Defence Materiel": Part No: 3: Environmental Test Methods: Issue 4
        • Def Stan 00-35: "Environmental Handbook for Defence Materiel": Part No: 4: Natural Environments: Issue 3
        • Def Stan 00-35: "Environmental Handbook for Defence Materiel": Part No: 4: Natural Environments: Issue 4
        • Def Stan 00-35: "Environmental Handbook for Defence Materiel": Part No: 5: Induced Mechanical Environments: Issue 4
        • Def Stan 00-35: "Environmental Handbook for Defence Materiel": Part No: 6: Induced Climatic, Chemical and Biological Environments: Issue 3
        • Def Stan 00-35: "Environmental Handbook for Defence Materiel": Part No: 6: Induced Climatic, Chemical and Biological Environments: Issue 4
      • Standard: Def Stan 00-40: "Reliability and Maintainability (R&M)"
        • Def Stan 00-40: "Reliability and Maintainability (R&M)" Part No: 1: Management Responsibilities and Requirements for Programmes and Plans: Issue 4
        • Def Stan 00-40: "Reliability and Maintainability (R&M)" Part No: 1: Management Responsibilities and Requirements for Programmes and Plans: Issue 5
        • Def Stan 00-40: "Reliability and Maintainability (R&M)" Part No: 1: Management Responsibilities and Requirements for Programmes and Plans: Issue 6
        • Def Stan 00-40: "Reliability and Maintainability (R&M)" Part No: 2: General Application Guidance on the Use of Part 1: Issue 2 (ARMP-2)
        • Def Stan 00-40: "Reliability and Maintainability (R&M)" Part No: 3: Application of National R&M Documents: Issue 1 (ARMP-3)
        • Def Stan 00-40: "Reliability and Maintainability (R&M)" Part No: 4: Guidance for Writing NATO R&M Requirements Documents
        • Def Stan 00-40: "Reliability and Maintainability (R&M)" Part No: 5: Guidance on R&M Training: Issue 1 (ARMP-5)
        • Def Stan 00-40: "Reliability and Maintainability (R&M)" Part No: 6: In-service R & M: Issue 1 (ARMP-6)
        • Def Stan 00-40: "Reliability and Maintainability (R&M)" Part No: 7: (ARMP-7) NATO R&M Terminology Applicable to ARMP's
        • Def Stan 00-40: "Reliability and Maintainability (R&M)" Part No: 8: Procurement of Off-the-Shelf Equipment: Issue 1 (ARMP-7)
      • Standard: Def Stan 00-41: "Reliability and Maintainability MOD Guide to Practices and Procedures"
        • Def Stan 00-41: "Reliability and Maintainability MOD Guide to Practices and Procedures" Issue 3
      • Standard: Def Stan 00-42: "Reliability and Maintainability Assurance Guides"
        • Def Stan 00-42: "Reliability and Maintainability (R&M) Assurance Guide": Part No: 3: R&M Case: Issue 1
        • Def Stan 00-42: "Reliability and Maintainability (R&M) Assurance Guide": Part No: 3: R&M Case: Issue 2
        • Def Stan 00-42: "Reliability and Maintainability (R&M) Assurance Guide": Part No: 3: R&M Case: Issue 3
        • Def Stan 00-42: "Reliability and Maintainability (R&M) Assurance Guide": Part No: 4: Testability: Issue 2
        • Def Stan 00-42: "Reliability and Maintainability Assurance Activity": Part No: 5: In -Service Reliability Demonstrations: Issue 1
        • Def Stan 00-42: "Reliability and Maintainability Assurance Activity": Part No: 6: Maintainability Demonstrations: Issue 1
        • Def Stan 00-42: "Reliability and Maintainability Assurance Guides": Part No: 1: One-Shot Devices/Systems: Issue 1
        • Def Stan 00-42: "Reliability and Maintainability Assurance Guides": Part No: 1: One-Shot Devices/Systems: Issue 2
        • Def Stan 00-42: "Reliability and Maintainability Assurance Guides": Part No: 2: Software: Issue 1
      • Standard: Def Stan 00-43: "Reliability and Maintainability Assurance Activity"
        • Def Stan 00-43: "Reliability and Maintainability Assurance Activity" Part No: 1: In-Service Reliability Demonstrations: Issue 1
        • Def Stan 00-43: "Reliability and Maintainability Assurance Activity": Part No: 2: Maintainability Demonstration: Issue 1
      • Standard: Def Stan 00-49: "MOD Guide to R&M Terminology Used in Requirements"
        • Def Stan 00-49: "MOD Guide to R&M Terminology Used in Requirements": Issue 2
        • Def Stan 00-49: "Reliability and Maintainability MOD Guide to Terminology Definitions": Issue 1
      • Standard: Def Stan 00-54: "Requirements for Safety Related Electronic Hardware in Defence Equipment"
        • Def Stan 00-54: "Requirements for Safety Related Electronic Hardware in Defence Equipment" Part No: 1: Requirements: Issue 1
        • Def Stan 00-54: "Requirements for Safety Related Electronic Hardware in Defence Equipment" Part No: 2: Guidance: Issue 1
      • Standard: Def Stan 00-55: "Requirements for Safety Related Software in Defence Systems"
        • Def Stan 00-55: "Requirements for Safety Related Software in Defence Systems": Part 1: Requirements: Issue 2
      • Standard: Def Stan 00-56: "Safety Management Requirements for Defence Systems"
        • Def Stan 00-56: "Safety Management Requirements for Defence Systems": Part No: 1: Requirements: Issue 2
        • Def Stan 00-56: "Safety Management Requirements for Defence Systems": Part No: 1: Requirements: Issue 3
        • Def Stan 00-56: "Safety Management Requirements for Defence Systems": Part No: 1: Requirements: Issue 4
        • Def Stan 00-56: "Safety Management Requirements for Defence Systems": Part No: 2: Guidance on Establishing a Means of Complying with Part 1: Issue 3
        • Def Stan 00-56: "Safety Management Requirements for Defence Systems": Part No: 2: Guidance on Establishing a Means of Complying with Part 1: Issue 4
      • Standard: Def Stan 00-60: "Integrated Logistic Support"
        • Def Stan 00-60: "Integrated Logistic Support": Part No: 0: Application of Integrated Logistic Support (ILS): Issue 4
        • Def Stan 00-60: "Integrated Logistic Support": Part No: 0: Application of Integrated Logistic Support (ILS): Issue 5
        • Def Stan 00-60: "Integrated Logistic Support": Part No: 0: Application of Integrated Logistic Support (ILS): Issue 6
        • Def Stan 00-60: "Integrated Logistic Support": Part No: 10: Electronic Documentation: Issue 4
        • Def Stan 00-60: "Integrated Logistic Support": Part No: 10: Electronic Documentation: Issue 5
        • Def Stan 00-60: "Integrated Logistic Support": Part No: 1: Logistic Support Analysis (LSA) and Logistic Support Analysis Record (LSAR): Issue 2
        • Def Stan 00-60: "Integrated Logistic Support": Part No: 1: Logistic Support Analysis (LSA) and Logistic Support Analysis Record (LSAR): Issue 3
        • Def Stan 00-60: "Integrated Logistic Support": Part No: 20: Application of Integrated Supply Support Procedures: Issue 5
        • Def Stan 00-60: "Integrated Logistic Support": Part No: 20: Application of Integrated Supply Support Procedures: Issue 6
        • Def Stan 00-60: "Integrated Logistic Support": Part No: 20: Application of Integrated Supply Support Procedures: Issue 7
        • Def Stan 00-60: "Integrated Logistic Support": Part No: 2: Guide to the Application of LSA and LSAR: Issue 4
        • Def Stan 00-60: "Integrated Logistic Support": Part No: 3: Guidance for Application of Software Support: Issue 2
        • Def Stan 00-60: "Integrated Logistic Support": Part No: 3: Guidance for Application of Software Support: Issue 3
      • Standard: Def Stan 02-8: "Guide for the Preparation of Statements of Technical Requirements for the Development of Systems and Equipment"
        • Def Stan 02-8 (NES 8) - Guide for the Preparation of Documents of Technical Requirements for the Development of Systems and Equipment
      • Standard: Def Stan 05-28: "NATO Guide to the Preparation of Specifications for the Procurement of Defence Materiel"
        • Def Stan 05-28: "NATO Guide to the Preparation of Specifications for the Procurement of Defence Materiel"
      • Standard: Def Stan 05-57: "Configuration Management of Defence Materiel"
        • Def Stan 05-57: "Configuration Management of Defence Materiel": Issue 4
        • Def Stan 05-57: "Configuration Management of Defence Materiel": Issue 5
      • Standard: Def Stan 05-61: "Quality Assurance Procedural Requirements"
        • Def Stan 05-61: "Quality Assurance Procedural Requirements": Part No: 1: Concessions: Issue 4
        • Def Stan 05-61: "Quality Assurance Procedural Requirements": Part No: 1: Deviation/Production Permits and Waivers/Concessions: Issue 3
      • Standard: Def Stan 05-91: "Quality System Requirements for Design/Development, Production, Installation and Servicing"
        • Def Stan 05-91: "Quality System Requirements for Design/Development, Production, Installation and Servicing (Adoption of ISO 9001-1994 or ISO 9001:2000 with Supplementary Requirements)"
      • Standard: Def Stan 05-95: "Quality System Requirements for the Design Development, Supply and Maintenance of Software"
        • Def Stan 05-95: "Quality System Requirements for the Design Development, Supply and Maintenance of Software": Issue 3
      • Standard: Def Stan 05-97: "Requirements for Deliverable Quality Plans"
        • Def Stan 05-97: "Requirements for Deliverable Quality Plans": Issue 1
        • Def Stan 05-97: "Requirements for Deliverable Quality Plans": Issue 2: DRAFT
    • US Mil Stds, Hdbks etc (Verif)
      • DOD-HDBK-743A Anthropometry of U.S. Military Personnel
      • DOD-HDBK-763 Human Engineering Procedures Guide
      • DOD-HDBK-763_NOTICE-1
      • DoD: 5000.1, 5000.2 Defense Acquisition
        • DoD 5000.1 - The Defense Acquisition System - Administrative Reissuance Incorporating Change 1, January 4, 2001
        • DoD 5000.1 - The Defense Acquisition System, DRAFT
        • DoD 5000.1 - The Defense Acquisition System, October 23, 2000
        • DoD 5000.1 - The Defense Acquisition System, October 23, 2000 [as PDF]
        • DoD 5000.2-R, "Mandatory Procedures for Major Defense Acquisition Programs (MDAPs) and Major Automated Information System (MAIS) Acquisition Programs," March 15, 1996
        • DoD 5000.2-R: Mandatory Procedures for Major Defense Acquisition Programs (MDAPs) and Major Automated Information System (MAIS) Acquisition Programs, April 5, 2002
        • DoD 5000.2-R: Mandatory Procedures for Major Defense Acquisition Programs (MDAPs) and Major Automated Information System (MAIS) Acquisition Programs, January 4, 2001 (INTERIM REGULATION)
        • DoD 5000.4-M - Department of Defense Manual Cost Analysis Guidance and Procedures
        • DoD Directive 5000.1, "Defense Acquisition," March 15, 1996
        • DoD Instruction 5000.2, Appendices, DRAFT
        • DoD Instruction 5000.2, "Mandatory Procedures for Major Defense Acquisition Programs (MDAPs) and Major Automated Information System Acquisition Programs (MAISAPs)," DRAFT
        • DoD Instruction 5000.2, "Operation of the Defense Acquisition System," October 23, 2000
        • DoD Instruction 5000.2, "Operation of the Defense Acquisition System," Change 1, January 4, 2001
        • DoD Memorandum: Mandatory Procedures for Major Defense Acquisition Programs (MDAPs) and Major Automated Information System (MAIS) Acquisition Programs - (interim guidance to DoD 5002.R)
        • DoDD 5000.59 - DoD Modeling and Simulation (M&S) Management (Including Change 1) 20 January 1998
        • DoDI 5000.61 DoD Modeling and Simulation (M&S) Verification, Validation, and Accreditation (VV&A) 29 April 1996
        • Memorandum for the defense acquisition community: Subject: Update of the DoD 5000 Documents
      • MIL-H-46855B - Human Engineering Requirements for Military Systems, Equipment, and Facilities
      • MIL-H-46855B - Human Engineering Requirements for Military Systems, Equipment, and Facilities - Amendment 2
      • MIL-HDBK-1467 - Software Common Operating Environment [DRAFT]
      • MIL-HDBK-217F
      • MIL-HDBK-245B
      • MIL-HDBK-245C - Preparation of Statement of Work (SOW)
      • MIL-HDBK-245D - Handbook for Preparation of Statement of Work (SOW)
      • MIL-HDBK-245D - Handbook for Preparation of Statement of Work (SOW) [as PDF]
      • MIL-HDBK-245E - Preparation of Statement of Work
      • MIL-HDBK-46855 - HUMAN ENGINEERING GUIDELINES FOR MILITARY SYSTEMS, EQUIPMENT, AND FACILITIES
      • MIL-HDBK-46855A - HUMAN ENGINEERING PROGRAM PROCESS AND PROCEDURES
      • MIL-HDBK-499-3 - Systems Engineering/Configuration Management Life Cycle Application [DRAFT]
      • MIL-HDBK-59A
      • MIL-HDBK-59B - Continuous Acquisition and Life-Cycle Support (CALS) Implementation Guide
      • MIL-HDBK-61 - Configuration Management Guidance
      • MIL-HDBK-727 - Design Guidance for Producibility
      • MIL-HDBK-759B Human Factors Engineering Design for Army Materiel
      • MIL-HDBK-761A Human Engineering Guidelines for Management Information Systems
      • MIL-HDBK-781
      • MIL-HDBK-781A - Handbook For Reliability Test Methods, Plans and Environments for Engineering, Development Qualification and Production
      • MIL-HDBK-782 (AR) - Software Support Environment Acquisition
      • MIL-HDBK-881 - Work Breakdown Structure
      • MIL-HDBK-881A - Work Breakdown Structure for Defense Materiel Items
      • Standard: DOD-1679A
      • Standard: DOD-STD-1467 (AR) "Software Support Environment"
        • DOD-STD-1467 (AR) "Software Support Environment"
      • Standard: DOD-STD-1702(NS)
      • Standard: MIL-PRF-49506
      • Standard: MIL-STD-1295A - Human Factors Engineering Design Criteria for Helicopter Cockpit Electro-Optical Display Symbology
        • MIL-STD-1295A Human Factors Engineering Design Criteria for Helicopter Cockpit Electro-Optical Display Symbology
      • Standard: MIL-STD-1388
      • Standard: MIL-STD-1388-1 - Logistic Support Analysis
        • MIL-STD-1388-1 - Logistic Support Analysis
      • Standard: MIL-STD-1388-1A - Logistics Support Analysis
        • MIL-STD-1388-1A - Logistics Support Analysis
        • Tailoring the Logistics Support Analysis Tasks (Mil-Std-1388-1A)
      • Standard: MIL-STD-1388-1B
      • Standard: MIL-STD-1388-2A
        • MIL-STD-1388-2A - DOD REQUIREMENTS FOR A LOGISTIC SUPPORT ANALYSIS RECORD
      • Standard: MIL-STD-1388-2B - DOD REQUIREMENTS FOR A LOGISTIC SUPPORT ANALYSIS RECORD
        • MIL-STD1388-2B - DOD REQUIREMENTS FOR A LOGISTIC SUPPORT ANALYSIS RECORD (21 JAN93) - Combined with NOTICE 1 (21 JAN 93)
      • Standard: MIL-STD-1390B (NAVY) Marine Corps Level of Repair System Users Manual, MCLORIA (Marine Corps)
      • Standard: MIL-STD-1390D - Level of Repair Analysis (LORA)
        • MIL-STD-1390D - Level of Repair Analysis (LORA)
        • MIL-STD-1390D NOTICE 1
      • Standard: MIL-STD-1456
        • MIL-STD-1456
      • Standard: MIL-STD-1456A - Configuration Management Plan
        • MIL-STD-1456A - Configuration Management Plan
      • Standard: MIL-STD-1472
      • Standard: MIL-STD-1472D Human Engineering Design Criteria for Military Systems, Equipment and Facilities
        • MIL-STD-1472D (NOTICE 1), MILITARY STANDARD, HUMAN ENGINEERING, DESIGN CRITERIA FOR MILITARY SYSTEMS, EQUIPMENT, AND FACILITIES
        • MIL-STD-1472D (NOTICE 2), MILITARY STANDARD, HUMAN ENGINEERING, DESIGN CRITERIA FOR MILITARY SYSTEMS, EQUIPMENT, AND FACILITIES
        • MIL-STD-1472D Human Engineering Design Criteria for Military Systems, Equipment and Facilities
      • Standard: MIL-STD-1478 - Task Performance Analysis
        • MIL-STD-1478 (NOTICE 1) - Task Performance Analysis
        • MIL-STD-1478 - Task Performance Analysis
      • Standard: MIL-STD-1521 (USAF) - Technical Reviews and Audits for Systems, Equipment, and Computer Programs
        • MIL-STD-1521 (USAF) - Technical Reviews and Audits for Systems, Equipment, and Computer Programs
      • Standard: MIL-STD-1521A (USAF) - Technical Reviews and Audits for Systems, Equipment, and Computer Programs
        • MIL-STD-1521 A (USAF) - Technical Reviews and Audits for Systems, Equipment, and Computer Programs
      • Standard: MIL-STD-1521B (USAF) - Technical Reviews and Audits for Systems, Equipment, and Computer Programs
        • MIL-STD-1521 B (USAF) - Technical Reviews and Audits for Systems, Equipment, and Computer Programs [as MSWORD]
        • MIL-STD-1521 B (USAF) - Technical Reviews and Audits for Systems, Equipment, and Computer Programs [as PDF]
        • MIL-STD-1521B (USAF) - Notice2
        • MIL-STD-1521B (USAF) - Notice3
      • Standard: MIL-STD-1528 (USAF)
        • MIL-STD-1528 (USAF)
      • Standard: MIL-STD-1528A (USAF) - Manufacturing Management Program
        • MIL-STD-1528A (USAF) - Manufacturing Management Program
      • Standard: MIL-STD-1546A
      • Standard: MIL-STD-1574A
        • MIL-STD-1574A
      • Standard: MIL-STD-1785
        • MIL-STD-1785
      • Standard: MIL-STD-1785A - Program Protection/System Security Engineering Management
        • MIL-STD-1785A - Program Protection/System Security Engineering Management
      • Standard: MIL-STD-1794 Human Factors Engineering Program for Intercontinental Ballistic Missile Systems
        • MIL-STD-1794 Human Factors Engineering Program for Intercontinental Ballistic Missile Systems
      • Standard: MIL-STD-1908 Definitions of Human Factors Terms
        • MIL-HDBK-1908B Definitions of Human Factors Terms
        • MIL-STD-1908 Definitions of Human Factors Terms
      • Standard: MIL-STD-2155(AS) - Failure Reporting, Analysis, and Corrective Action System (FRACAS)
        • MIL-STD-2155(AS) - Failure Reporting, Analysis, and Corrective Action System (FRACAS)
      • Standard: MIL-STD-2165 - Military Standard Testability Program for Electronic Systems and Equipments
        • MIL-STD-2165 - Military Standard Testability Program for Electronic Systems and Equipments
        • Standard: MIL-STD-1309 - Definition of Terms for Test, Measurement and Diagnostic Equipment
          • MIL-STD-1309 - Definition of Terms for Test, Measurement and Diagnostic Equipment
        • Standard: MIL-STD-2077 - Test Program Sets, General Requirements for
          • MIL-STD-2077 - Test Program Sets, General Requirements for
        • Standard: MIL-STD-470 - Maintainability Program for Systems and Equipment
          • MIL-STD-470 - Maintainability Program for Systems and Equipment
        • Standard: MIL-STD-471 - Maintainability Verification/Demonstration/Evaluation
          • MIL-STD-471 - Maintainability Verification/Demonstration/Evaluation
        • Standard: MIL-STD-721 - Definition of Effectiveness Terms for Reliability and Maintainability
          • MIL-STD-721 - Definition of Effectiveness Terms for Reliability and Maintainability
      • Standard: MIL-STD-2549 - Configuration Management Data Interface
        • MIL-STD-2549 - Configuration Management Data Interface (PDF)
        • MIL-STD-2549 - Configuration Management Data Interface (ZIP file with DiD Files and appendixes)
      • Standard: MIL-STD-461B - Electromagnetic Emission and Susceptibility Requirements for the Control of Electromagnetic Interference
        • MIL-STD-461B - Electromagnetic Emission and Susceptibility Requirements for the Control of Electromagnetic Interference
      • Standard: MIL-STD-461C - Electromagnetic Emission and Susceptibility Requirements for the Control of Electromagnetic Interference
        • MIL-STD-461C - Electromagnetic Emission and Susceptibility Requirements for the Control of Electromagnetic Interference
      • Standard: MIL-STD-461D - Requirements for the Control of Electromagnetic Interference Emissions and Susceptibility
        • MIL-STD-461D - Requirements for the Control of Electromagnetic Interference Emissions and Susceptibility
      • Standard: MIL-STD-462
        • MIL-STD-462
      • Standard: MIL-STD-462D - Department of Defense Test Method Standard for Measurement of Electromagnetic Interference Characteristics
        • MIL-STD-462D - Department of Defense Test Method Standard for Measurement of Electromagnetic Interference Characteristics
      • Standard: MIL-STD-470A - Maintainability Program for Systems and Equipment
        • MIL-STD-470A - Maintainability Program for Systems and Equipment
      • Standard: MIL-STD-470B - Maintainability Program for Systems and Equipment
        • MIL-STD-470B - Maintainability Program for Systems and Equipment
      • Standard: MIL-STD-480 - Configuration Control - Engineering Changes, Deviations, and Waivers
        • MIL-STD-480 - Configuration Control - Engineering Changes, Deviations, and Waivers
      • Standard: MIL-STD-483 (USAF) - Configuration Management Practices For Systems
        • MIL-STD-483 (USAF) - Configuration Management Practices For Systems
      • Standard: MIL-STD-483A - Configuration Management Practices For Systems, Equipment, Munitions, and Computer Programs
      • Standard: MIL-STD-490
      • Standard: MIL-STD-490A - SPECIFICATION PRACTICES
        • MIL-STD-490A - Specification Practices
        • MIL-STD-490A (NOTICE 1), MILITARY STANDARD, SPECIFICATION PRACTICES
        • MIL-STD-490A (NOTICE 1), MILITARY STANDARD, SPECIFICATION PRACTICES (31 AUG 1995) [S/S BY MIL-STD-961]
      • Standard: MIL-STD-490B - PROGRAM-UNIQUE SPECIFICATIONS, PREPARATION OF
        • MIL-STD-490B - PROGRAM-UNIQUE SPECIFICATIONS, PREPARATION OF
        • MIL-STD-490B - PROGRAM-UNIQUE SPECIFICATIONS, PREPARATION OF [as PDF scan]
      • Standard: MIL-STD-499
        • MIL-STD-499 - Systems Engineering Management (USAF)
      • Standard: MIL-STD-499A - Engineering Management
        • MIL-STD-499A - Engineering Management
      • Standard: MIL-STD-499B - Systems Engineering
        • Deficiencies of MIL-STD-499B Draft Fig B Version: 6 May 1994
        • MIL-STD-499B Draft 910515 - Systems Engineering
        • MIL-STD-499B Draft 920506 - For coordination review
        • MIL-STD-499B Draft 930824 - Joint OSD / Services / Industry Working Group - 7 Sept 93
        • MIL-STD-499B Draft 940506 PDF
      • Standard: MIL-STD-680
      • Standard: MIL-STD-781D
        • MIL-STD-781D
      • Standard: MIL-STD-785 - Reliability Program for Systems and Equipment Development and Production
        • MIL-STD-785 - Reliability Program for Systems and Equipment Development and Production
      • Standard: MIL-STD-847A
      • Standard: MIL-STD-881 - Work Breakdown Structures for Defense Materiel Items
        • MIL-STD-881
      • Standard: MIL-STD-881A - Work Breakdown Structures for Defense Materiel Items
        • MIL-STD-881A - Work Breakdown Structures for Defense Materiel Items
      • Standard: MIL-STD-881B
        • MIL-STD-881B
      • Standard: MIL-STD-882 "System Safety Program Requirements"/"Standard Practice for System Safety"
      • Standard: MIL-STD-882A
        • MIL-STD-882A
      • Standard: MIL-STD-882B - System Safety Program Requirements
        • MIL-STD-882B - System Safety Program Requirements
      • Standard: MIL-STD-882C - System Safety Program Requirements
        • MIL-STD-882C - System Safety Program Requirements
        • MIL-STD-882C Change Notice 1
      • Standard: MIL-STD-882D - Standard Practice for System Safety
        • MIL-STD-882D - Standard Practice for System Safety
        • MIL-STD-882D - Standard Practice for System Safety Program Requirements [DRAFT, MSWORD]
      • Standard: MIL-STD-961- Department of Defense Standard Practice for Defense Specifications
        • MIL-STD-961- Department of Defense Standard Practice for Defense Specifications
      • Standard: MIL-STD-961C
        • MIL-STD-961C
      • Standard: MIL-STD-961D - Department of Defense Standard Practice for Defense Specifications
        • MIL-STD-961D - Department of Defense Standard Practice for Defense Specifications
      • Standard: MIL-STD-962B
        • MIL-STD-962B
      • Standard: MIL-STD-962C - Department of Defense Standard Practice - Defense Standards and Handbooks
        • MIL-STD-962C - Department of Defense Standard Practice - Defense Standards and Handbooks
      • Standard: MIL-STD-963A
        • MIL-STD-963A
      • Standard: MIL-STD-963B - Department of Defense Standard Practice - Data Item Descriptions (DIDs)
        • MIL-STD-963B - Department of Defense Standard Practice - Data Item Descriptions (DIDs)
      • Standard: MIL-STD-965
        • MIL-STD-965
      • Standard: MIL-STD-965A - Parts Control Program
        • MIL-STD-965A - Parts Control Program
      • Standard: MIL-STD-973 - Configuration Management
        • MIL-STD-973 - Configuration Management PDF SCAN
      • Technical Report Describing Contents of MIL-HDBK-171 (DRAFT) - Work Breakdown Structure Elements for Software
      • USAF Standards
        • AFR 66-14 - The US Air Force Equipment Maintenance Program
        • Standard: AFR 122-10: SAFETY DESIGN AND EVALUATION CRITERIA FOR NUCLEAR WEAPON SYSTEMS
        • Standard: AFR 122-9: THE NUCLEAR SURETY DESIGN CERTIFICATION PROGRAM FOR NUCLEAR WEAPON SOFTWARE AND FIRMWARE
    • SE Landmark Standards (Dup)
      • Current SE Standards
      • Standards Facesheets
        • Facesheet: DID: Systems Engineering Management Plan (SEMP)
        • Facesheet: EIA 632
        • Facesheet: MIL-STD-499B - Joint OSD/Services/Industry Working Group MIL-STD-499B - 7 Sept 93
        • Facesheet: Technology Australasia Standard No 001 Systems Engineering
      • Superseded SE Standards
        • AFSCM 375-5 - Systems Engineering Management Procedures
  • Capability Maturity Models (CMMs)
    • Capability Maturity Models (CMM) overview
      • Capability Maturity Models
      • Review of Systems Engineering Capability Models
    • Capability Maturity Model Integration (CMMI)
      • Methodology: Capability Maturity Model Integration (CMMI)
      • CMMI Briefing
      • CMMI JITL (Just in Time Lecture)
      • CMMI Tutorial
      • CMMI v0.2B Public Release Draft
        • Architecture Views
        • Change Control Document (form)
        • CMMI Product Release Plan
        • CMMI Product Suite v1.4
        • CMMI SE/SW - Continuous Representation - Volume1
        • CMMI SE/SW - Continuous Representation - Volume2
        • CMMI SE/SW - Staged Representation - Volume1
        • CMMI SE/SW - Staged Representation - Volume2
        • Public Review Release Scheduled
        • Selecting a Model
      • CMMI v1.01 Continuous Representation
      • CMMI v1.02 - Staged Representation
      • CMMI v1.1 Continuous Representation
      • CMMI-DEV, V1.2
    • Critical Process Assessment Tool
    • Electronic Industries Alliance: EIA/IS-731 Systems Engineering
      • EIA 731 - Presentation
      • EIA 731 - Some Personal Observations - Presentation
      • EIA/IS-731.1 Document1 - Systems Engineering Capability Model - Intro
      • EIA/IS-731.1 Document2 - Systems Engineering Capability Model
      • EIA/IS-731.2 Document1 - Systems Engineering Capability Model Appraisal Method - Intro
      • EIA/IS-731.2 Document2 - Systems Engineering Capability Model Appraisal Method
      • EIA 731 - Questionnaire
      • EIA 731 - Release
    • Federal Enterprise Architecture Program Management Office (FEAMO) IT Performance Reference Model (PRM) v1.0
      • The Performance Reference Model v1.0
    • Software Acquisition CMM
      • Software Acquisition Capability Maturity Model (SA-CMM) v1.01
      • Software Acquisition Capability Maturity Model v0.03
    • Software Capability Maturity Model (SWCMM)
      • CMM Practices
    • Systems Engineering Capability Maturity Model (SE-CMM)
      • SE CMM Appraisal Method v1.0
        • A Description of the Systems Engineering Capability Maturity Model Appraisal Method v1.0
      • SE CMM Appraisal Method v1.1
        • A Description of the Systems Engineering Capability Maturity Model Appraisal Method v1.1
        • SAM v1.1 Appendix
      • SE CMM Overview
      • SE CMM Relationships
        • Relationships Between the Systems Engineering Capability Maturity Model and Other Products, v1.0 - 1 of 2
        • Relationships Between the Systems Engineering Capability Maturity Model and Other Products, v1.0 - 2 of 2
      • SE CMM v1.0
        • A Systems Engineering Capability Maturity Model v1.0
      • SE CMM v1.1
        • A Systems Engineering Capability Maturity Model v1.1
      • SSE CMM v1.1
    • Systems Security Engineering Capability Maturity Model (SSE CMM) v1.1
  • Acquisition
    • Evolutionary Acquisition 'Tiger' Team Study
    • A Systems Approach to Acquisition Decision Making
    • Acquisition Logistics Guide
    • Acquisition Strategy Guide
    • Naval Aviation Systems Acquisition Guide
    • Simulation Based Acquisition: A New Approach
    • Systems Acquisition Manager's Guide For the Use of Models and Simulations
    • The Defense Acquisition Challenge: A strategy for Improving Weapon System Affordability
    • Introduction to Defense Acquisition Management
    • A Model for Leading Change : Making Acquisition Reform Work
    • Acquisition-DOD(Aust)CSLCM2002
      • Capability Life Cycle Management Guide 2002 [as ZIP archive]
    • Acquisition-USDOD Framework
      • Defense Acquisition Management Framework 1
      • Defense Acquisition Management Framework 2
      • Defense Acquisition Management Framework Guide
      • DoD Software Acquisition Management Notional Lifestyle Activity Chart
    • Acquisition-VV&A Guide (USDOD)
    • Department of Defense Acquisition Management Metrics
    • DOD Acquisition Systems Comparisons
      • A Comparison of the Defense Acquisition Systems of Australia, Japan, South Korea, Singapore and the United States
      • A Comparison of the Defense Acquisition Systems of France, Great Britain, Germany and the United States
    • Evolutionary Acquisition Strategy
    • Evolutionary Acquisition Strategy Guidelines
  • Guides, Handbooks, Reports & Papers
    • Capability Definition Documents Guide
    • SE General
      • Air-Force Systems Engineering Policy
      • DAO Systems Engineering Study Final Report
      • DERA Systems Engineering Practices
      • DERA Systems Engineering Practices: reference model
      • DoE vs. DoD System Engineering Application
      • Interim Guidance on the Application of Systems Engineering Standards to Major Projects Undertaken by the DAO
      • Introduction to Systems Engineering
      • NASA Systems Engineering Handbook
      • System Life Cycle and Methodologies: Chapter 3
      • Systems Engineering Fundamentals
      • Systems Engineering Guide - Version 1.1
      • Systems Engineering INCOSE Guide (1997)
      • Systems Engineering Introduction (RAAF)
      • Systems Engineering Management Procedures
      • Systems Engineering Principles - Essence and Implementation
      • Systems Engineering Process Improvement
      • The Application of Systems Engineering to the RAAF
      • Twelve Systems Engineering Roles
    • DoD: New 5000 Documents
    • Formal Inspection Process version 2.0
    • Handbook for Decision Analysis
    • Interactive Electronic Training Manual (IETM) Guide
    • One Over One Approval
    • A Survey of Simulation Tools for Requirements Engineering
    • Capability Systems Life Cycle Management Manual 2002, DoD (Australia) [as ZIP archive]
    • DAO Manual-Spec Writing (Draft) [as ZIP archive]
    • DoD 4245.7-M - Transition From Development to Production
    • DSMC Systems Engineering Management Guide
    • Federal Aviation Administration Standard Work Breakdown Structure (WBS)
    • Guidelines for Successful Acquisition and Management of Software-Intensive Systems [as ZIP archive]
    • Hardware/Software Partitioning of Real-Time Systems
    • Inspection Method
      • Candidate: Specification Quality Control Inspection: Team Leader Course
      • Optimizing Software Inspections
      • Specification Quality Control (SQC): A Practical Inspection Workshop on Requirements Specification
    • Integrated Product and Process Development (IPPD) handbooks
      • DoD Integrated Product and Process Development Handbook
      • DoD Integrated Product and Process Development Handbook [as PDF scan]
      • DoD Integrated Product and Process Development Handbook: as DOC
      • DoD Integrated Product and Process Development Handbook: Chapter 1: Introduction only
      • Rules of the road: a guide for leading successful Integrated Product Teams: Nov 95
      • Rules of the road: a guide for leading successful Integrated Product Teams: Oct 99
    • Intellectual Property
      • Getting Smarter About Knowledge Rights
      • Intellectual Property Principles
    • Knowledge Management Engineering
      • A Systems Approach to Engineering and Managing a Knowledge Management System
      • Knowledge engineering for systems engineers
      • The Evolution of KM at Buckman Laboratories
    • Navy Specification Study Report, Requirements and Specifications
    • PRINCE2
      • A Comparison of PRINCE2 against PMBOK
      • A Summary of PRINCE2
      • An Introduction To PRINCE
      • Comparison of PRINCE2 and BS EN ISO 9000:2000
      • Managing Successful Projects with PRINCE2
      • Methodology: PRINCE2®
      • Official PRINCE2® Website
      • Relationship between the Project Management Body of Knowledge (PMBOK) and the PRINCE2 Project Management Methodology.
    • Product Engineering
      • Performance Based Product Definition Guide
    • Quality of Test Methods
      • Analyzing Quality of Test Methods
      • The Alternatives and Supplements to Conventional Testing
    • RADC Reliability Engineer's Toolkit
    • Requirements Engineering - Viewpoints
      • Viewpoints for requirements elicitation: a practical approach
      • Viewpoints: principles, problems and a practical approach to requirements engineering
    • Requirenautics Quarterly
      • Requirenautics Quarterly: Issue 01 (October 1994)
      • Requirenautics Quarterly: Issue 02 (January 1995)
      • Requirenautics Quarterly: Issue 09 (January 1997)
      • Requirenautics Quarterly: Issue 10 (April 1997)
      • Requirenautics Quarterly: Issue 11 (July 1997)
      • Requirenautics Quarterly: Issue 12 (October 1997)
      • Requirenautics Quarterly: Issue 13 (January 1998)
      • Requirenautics Quarterly: Issue 14 (April 1998)
      • Requirenautics Quarterly: Issue 15 (October 1998)
      • Requirenautics Quarterly: Issue 19 (December 1999)
      • Requirenautics Quarterly: Issue 20 (March 2000)
      • Requirenautics Quarterly: Issue 21 (July 2000)
      • Requirenautics Quarterly: Issue 22 (October 2000)
      • Requirenautics Quarterly: Issue 23 (March 2001)
      • Requirenautics Quarterly: Issue 24 (July 2001)
      • Requirenautics Quarterly: Issue 25 (January 2002)
      • Requirenautics Quarterly: Issue 26 (May 2002)
      • Requirenautics Quarterly: Issue 27 (November 2002)
    • Reto Schmid
    • SCENT: A Method Employing Scenarios to Systematically Derive Test Cases for System Test
    • Soft Systems Methodology
    • Software Independent Verification and Validation
    • SW Acquisition Manual
    • Test and Evaluation Management Guide
    • Unifying Software Engineering and Systems Engineering
    • Verification, Validation and Accreditation (VV&A) Recommended Practices Guide, US DoD [as ZIP archive]
    • Virtual Prototyping : Concept to Production
    • Work Breakdown Structure: The Enabler of Project Success
    • Requirements Analysis
      • Human Factors in Requirements Engineering
      • Improving the Quality of Requirements with Scenarios
      • Intro to Principals of Project Management - Requirements-Driven Management
      • PERE: Evaluation and Improvement of Dependable Processes
      • Requirements Analysis - Typical Process Description
      • Requirements Analysis/Management
      • Requirements Generation System
      • Requirements Management Function - SOW Development
      • Requirements Management Starter Kit
      • Requirements Metrics: The Basis of Informed Requirements Engineering Management
      • Requirements Process Improvement Through the Phased Introduction of Good Practice
      • Requirements Tools Evaluation User Needs
    • Specification Writing
      • Australian Army Specification Manual - Specification Writing Guide (1996 Draft)
      • Australian Army Specification Manual - Specification Writing Guide (1998)
      • DAO Manual-Spec Writing (Draft)
      • Guide to Specification Writing
      • Navy Specification Study - Report 1 - Industry Survey
      • Specification Handbook
    • Physical and Logical Design
      • Foundational Concepts for Model Driven System Design
    • Effectiveness Evaluation and Decision
      • Logical Decisions Introductory Tutorial
      • Logical Decisions Introductory Tutorial (text extract)
      • Twelve Tough Questions
    • Systems Integration
      • Concurrent Engineering/Integrated Product Development Handbook to Understanding and Implementation
      • DoD Guide to Integrated Product and Process Development
    • Verification & Validation
      • Independent verificattion and validation (IV&V)
      • Management Guide for Independent Verification & Validation (IVV)
    • Engineering Management
      • Managing Risk in Procurement Handbook
      • Air Force Materiel Command (AFMC): risk management pamphlet
      • Best Practices - How to Avoid Surprises In The Worlds Most Complicated Technical Process
      • Program Management Risk Reduction Roadmaps
      • Top Eleven Ways to Manage Technical Risk
      • DSMC Program Managers Tool Kit
      • Evolutionary Delivery Project Management
      • FM 770-78
      • Guidelines for the Investment Analysis Team's Alternatives Risk Assessment
      • Integrated Product Development Implementation Guide
      • Integrated Product Teams to Target Key Engine Programs
      • Navigating the Digital Environment: A Program Manager's Perspective
      • One Hundred Rules for NASA Project Managers
      • Program Management 2000: Know the Way (How Knowledge Management Can Improve DOD Acquisition)
      • Risk Assessment Methodology for Technology and Producibility
      • Risk Assessment Methodology for Technology and Producibility
      • Risk Management Guide for DoD Acquisition
      • Scheduling Guide for Program Managers
      • Using Prince2 in System Engineering Projects
      • Utilize Integrated Product Teams (IPT)
    • Functional Analysis and Behaviour
      • Support for Representation of Functional Behavior Specifications in AP-233
    • Cost & Scheduling
      • NASA Cost/Schedule Assessment Guide (Gruhl)
      • NASA Cost/Schedule Assessment Guide
    • Human and Social Engineering
      • Human factors and engineering methodologies: complementary or insurmountable?
      • Towards an Improved Understanding of Humans as the Components that Implement Systems Engineering
    • Business Engineering
      • Delivering Results : Evolving BPR From Art to Engineering
      • Performance Based Business Environment - Integrated PBBE Guide
    • Novel, curious, and humorous engineering topics
      • An Introduction to the Game of Cricket
      • Theory of Inventive Problem Solving
    • Space Engineering
      • Space Engineering
      • The System Engineering Process Definition as Part of the European Cooperation for Space Standardization (ECSS)
  • Forms
    • Functional Model Change Request
    • Requirements Clarification
    • Requirements Clarification Form
    • Trouble Report
  • Example SE Documents
    • Example SE Docs Read Me
    • Interface Requirements Spec
    • Operational Concept Description
    • Reqts Traceability Report
    • System Specifications
      • A SAR Capability System Spec
      • B Buoy System Specification
      • C Resistor Specification
    • System-Subsystem Design Description
  • Emailing Lists
    • INFORMS Emailing List
    • Requirements Engineering Online (RE-online) Mailing List
    • Software Requirements Engineering Mailing List
  • Project Outcomes Data
    • Quality Assurance and the Sinking of The Largest Offshore Oil Platform
    • What Went Wrong? Unsuccessful Information Technology Projects
  • Checklists
  • Cartoons
    • Computer Aided Logistics Support Cartoon
    • Standard Generalizes Mark Up Language
  • SE Definitions documents
    • Definitions - DSMC Definitions Acro & Abbrev
      • DSMC Acronyms and Abbreviations
      • DSMC Definitions
    • Definitions of "Verification"
    • Glossary of Modeling and Simulation Terminology
  • SWE Guides, Handbooks, Reports & Papers
    • Estimation, Target Setting, and Control
    • Guide to the Software Engineering Body of Knowledge
    • IDEAL: A User’s Guide for Software Process Improvement
    • Principles For Software Quality
      • New Directions in Software Improvement
      • Process Out Quality In
      • Software Quality Summit: What Works and What Does Not Work?
      • The Ten Most Powerful Principles for Quality in [Software and] Software Organizations [as DOC article]
      • The Ten Most Powerful Principles for Quality in [Software and] Software Organizations [as PDF presentation]
    • Software Engineering Management (Gilb)
      • Deadline pressure: how to beat it
      • Powerful Measures and Pitiful Measures of Software Engineering [as DOC article]
      • Powerful Measures and Pitiful Measures of Software Engineering [as PDF presentation]
    • Software Requirements Elicitation Checklist
    • The 10 Management Actions for Software Control: The Value-Focused Approach to Management
    • Version Models for Software Configuration Management
  • Specialty Engineering
    • Aesthetic Appeal Engineering
    • Cost Estimating
      • Applying an Activity Based Counting Technique to System Design Efforts
      • Automated Cost Estimating Integrated Tools (ACEIT)
      • COSYSMO cost estimation
        • COSYSMO DELPHI Round 2
        • COSYSMO Progress Report #1 for August-September 2002
        • COSYSMO Progress Report #2 for December 2002
        • COSYSMO Tutorial H01 INCOSE2003
      • Economic Information for Investment Analysis
      • FAA Standard Cost Estimation Methodology
      • Factors for FAA Cost Estimating and Analysis
      • Parametric Cost Estimating Handbook (ZIP archive)
    • Human Factors Engineering
    • Maintainability Engineering
    • Producibility Engineering
    • Reliability Engineering
    • Safety Engineering
      • Annex 1: Software Engineering Tasks - Case Tools
      • DOE Risk Management Guide
    • Security Engineering
    • Trust Engineering
  • Links (related)
    • List of Potentially Useful PRINCE2 Websites
    • Web Links & Bibliography

SWE Goldmine menu

  • Software Engineering
    • An Introduction to FPA
    • Extreme Programming : Interview with Kent Beck
    • Function Point Counting Practices Manual
  • Software Standards
    • AS Software Standards
      • Standard - AS 3563 - Software Quality Management System
    • IEEE Software Standards
      • Standard: IEEE Std 1002 - IEEE Standard Taxonomy for Software Engineering Standards
        • [External] IEEE Std 1002-1987 - IEEE Standard Taxonomy for Software Engineering Standards
      • Standard: IEEE Std 1008 - IEEE Standard for Software Unit Testing
        • [External] IEEE Std 1008-1987 - IEEE Standard for Software Unit Testing
      • Standard: IEEE Std 1012 - IEEE Standard for Software Verification and Validation
        • [External] IEEE Std 1012-2004 - IEEE Standard for Software Verification and Validation
      • Standard: IEEE Std 1016 - IEEE Standard for Information Technology-Systems Design - Software Design Descriptions
        • [External] IEEE Std 1016-2009 - IEEE Standard for Information Technology-Systems Design - Software Design Descriptions
      • Standard: IEEE Std 1028 - IEEE Standard for Software Reviews and Audits
        • [External] IEEE Std 1028-2008 - IEEE Standard for Software Reviews and Audits
      • Standard: IEEE Std 1042 - IEEE Guide to Software Configuration Management
        • [External] ANSI/IEEE Std 1042-1987 - IEEE Guide to Software Configuration Management
      • Standard: IEEE Std 1045 - IEEE Standard for Software Productivity Metrics
        • [External] IEEE Std 1045-1992 - IEEE Standard for Software Productivity Metrics
      • Standard: IEEE Std 1058 - IEEE Standard for Software Project Management Plans
        • [External] IEEE Std 1058-1998 IEEE Standard for Software Project Management Plans
        • [External] IEEE Std 1058.1-1987 IEEE Standard for Software Project Management Plans
      • Standard: IEEE Std 1061 - IEEE Standard for a Software Quality Metrics Methodology
        • [External] IEEE Std 1061-1992 - IEEE Standard for a Software Quality Metrics Methodology
        • [External] IEEE Std 1061-1998 - IEEE Standard for a Software Quality Metrics Methodology
      • Standard: IEEE Std 1063 - IEEE Standard for Software User Documentation
        • [External] IEEE Std 1063-1987 - IEEE Standard for Software User Documentation
        • [External] IEEE Std 1063-2001 - IEEE Standard for Software User Documentation
      • Standard: IEEE Std 1074 - IEEE Standard for Developing a Software Project Life Cycle Process
        • [External] IEEE Std 1074-1991 - IEEE Standard for Developing Software Life Cycle Processes
      • Standard: IEEE Std 1209-1992 - IEEE Recommended Practice for the Evaluation and Selection of CASE Tools [Draft]
      • Standard: IEEE Std 1219 - IEEE Standard for Software Maintenance
        • [External] 1219-1992 - IEEE Standard for Software Maintenance
        • [External] 1219-1998 - IEEE Standard for Software Maintenance
      • Standard: IEEE Std 1298 - Software Quality Management System. Part 1: Requirements. Adopted From Standards Australia
        • [External] IEEE Std 1298 - Software Quality Management System. Part 1: Requirements. Adopted From Standards Australia
      • Standard: IEEE Std 14764-2006 - Software Engineering & Software Life Cycle Processes & Maintenance
        • ISO/IEC 14764 IEEE Std 14764-2006 International Standard - ISO/IEC 14764 IEEE Std 14764-2006 Software Engineering & Software Life Cycle Processes & Maintenance
      • Standard: IEEE Std 610 - IEEE Standard Glossary of Software Engineering Terminology
        • [External] IEEE Std 610.12-1990 - IEEE Standard Glossary of Software Engineering Terminology
      • Standard: IEEE Std 730 - IEEE Standard for Software Quality Assurance Plans
        • [External] IEEE Std 730-2002 - IEEE Standard for Software Quality Assurance Plans
      • Standard: IEEE Std 828 - IEEE Standard for Software Configuration Management Plans
        • [External] IEEE Std 828-2005 - IEEE Standard for Software Configuration Management Plans
      • Standard: IEEE Std 829 - IEEE Standard for Software and System Test Documentation
        • [External] IEEE Std 829-2008 - IEEE Standard for Software and System Test Documentation
      • Standard: IEEE Std 830 - IEEE Recommended Practice for Software Requirements Specifications
        • [External] IEEE Std 830-1998 - IEEE Recommended Practice for Software Requirements Specifications
      • Standard: IEEE Std 982 - IEEE Standard Dictionary of Measures of the Software Aspects of Dependability
        • [External] IEEE Std 982.1-2005 - IEEE Standard Dictionary of Measures of the Software Aspects of Dependability
      • Standard: IEEE Std 982.1 - IEEE Standard Dictionary of Measures to Produce Reliable Software
        • [External] IEEE Std 982.1-1988 - IEEE Standard Dictionary of Measures to Produce Reliable Software
      • Standard: IEEE Std 982.2 - IEEE Guide for the Use of IEEE Standard Dictionary of Measures to Produce Reliable Software
        • [External] IEEE Std 982.2-1988 - IEEE Guide for the Use of IEEE Standard Dictionary of Measures to Produce Reliable Software
      • Standard: IEEE Std 990 - IEEE Recommended Practice for Ada as a Program Design Language
        • [External] IEEE Std 990-1987 - IEEE Recommended Practice for Ada as a Program Design Language
      • Standard: J-Std-016 - Standard for Information Technology - Software Life Cycle Processes - Software Development - Acquirer-Supplier Agreement (Issued for Trial Use)
        • Standard: IEEE 1498 / EIA 640 (working draft of J-STD-016)
        • [External] J-STD-016-1995 Trial-Use Standard for Information Technology - Software Life Cycle Processes - Software Development - Acquirer-Supplier Agreement
    • ISO Software Standards
      • Standard: ISO/IEC 12207 - Software Lifecycle Processes
        • ISO/IEC 12207 SW LC Processes - 12207 Description
        • ISO/IEC 12207 SW LC Processes - 12207 Tutorial
        • ISO/IEC 12207:2008
      • Standard: ISO/IEC 15504
      • Standard: ISO/IEC 15939 - Software Measurement Process
    • NASA Software Standards
      • NASA Software DIDs
        • NASA Software Documentation Standard: NASA-DID-999
      • NASA Software Documentation Standard Appendix D
      • Standard: NASA-STD-2100-91 Software Documentation
        • NASA Software Documentation Standard: NASA-STD-2100-91
    • OMG Software Standards
      • Standard: Unified Modeling Language (UML)
        • The Current Official UML Specification
        • UML 2.2 Superstructure and Infrastructure
        • UML Diagram Notation and Semantics
        • [External] UML Specification v.1.3
        • [External] UML Specification v.1.4
        • [External] UML Specification v.1.4.2
        • [External] UML Specification v.1.5
        • [External] UML Specification v.2.0
        • [External] UML Specification v.2.1.1
        • [External] UML Specification v.2.1.2
        • [External] UML Specification v.2.2
        • [External] UML Specification v.2.3-Beta2 [in process]
        • [External] UML2.2 infrastructure specification: formal/2009-02-04: PDF
        • [External] UML2.2 superstructure specification: formal/2009-02-02: PDF
      • Standard: Model Driven Architecture (MDA)
      • Standard: OMG: Unified Profile for DODAF/MODAF (UPDM)
    • Standard: EEE493
    • US Military and DoD Software Standards
      • Standard: DoD-STD-1703
      • Standard: DOD-STD-2167 - Defense Systems Software Development
        • DOD-STD-2167
      • Standard: DoD-STD-2167A - Defense Systems Software Development
        • DoD-STD-2167A - Defense Systems Software Development
        • DoD-STD-2167A - Defense Systems Software Development [as PDF scan]
      • Standard: DOD-STD-2168 - Defense System Software Quality Program
        • DOD-STD-2168 - Defense System Software Quality Program
        • DOD-STD-2168 - Defense System Software Quality Program [as PDF]
      • Standard: DoD-STD-7935
        • DoD-STD-7935
      • Standard: DoD-STD-7935A - DoD Automated Information Systems (AIS) Documentation Standards
        • DoD-STD-7935A - DoD Automated Information Systems (AIS) Documentation Standards
      • Standard: MIL-S-52779A
        • MIL-S-52779A
      • Standard: MIL-STD-498 - Software development and documentation
        • MIL-STD-498 (NOTICE 1), MILITARY STANDARD, SOFTWARE DEVELOPMENT AND DOCUMENTATION (27 MAY 1998)
        • MIL-STD-498 - Software development and documentation (PDF)
        • MIL-STD-498 - Software development and documentation - WORD resources
          • MIL-STD-498 - Software development and documentation (WORD/DOC ZIPPED with DIDs and MS tools)
          • MIL-STD-498 - Software development and documentation (WORD/DOC)
      • [DUPLICATE] Standard: MIL-STD-2168 - Defense System Software Quality Program
  • Software Engineering Tools

Standards quick search

  • ADF (1)
  • AS (3)
  • BSI (2)
  • AFR (3)
  • AIAA (0)
  • ANSI (4)
  • ARMY (0)
  • CMU/SEI (16)
  • DIDs (169)
  • DoD (31)
    • DOD-HDBK (3)
  • ECSS (0)
  • EIA (29)
  • ESA (0)
  • FIPS PUBS (2)
  • IDEF (18)
  • IEEE (66)
  • ISO (19)
  • MIL-HDBK (28)
  • MIL-STD (151)
  • MIL-PRF (1)
  • MoD (103)
    • UK DEFSTAN (103)
  • NASA (3)
  • NIST (1)
  • OMG (16)
  • SAE (1)
  • USAF (1)
  • USN (0)
  • Other (9)

User Login

Enter username without spaces

Search by content type

  • Documents search - All
    • Search Documents (table view)
    • Browse Documents (table view)
    • Search Documents (list view)
    • Browse Documents (list view)
    • Search Documents (abstracts & extracts)
    • Browse Documents (abstracts & extracts)
  • Standards & Methodologies search - all
    • Standards (superseded) info
    • Standards (cancelled) info
  • Organizations search
  • Publishers search
  • People search
  • Journals search

Training Quicklinks

  • Systems Engineering
  • Software Engineering
  • OCD & CONOPS
  • Tender evaluation
  • Requirements Engineering
  • Requirements Analysis
  • Specification Writing
  • Cognitive Systems Engineering
  • PRINCE2™ Project Management

Access the SE Goldmine

A username and password is required for access to the resources. If you are a client of PPI or subsidiary company CTI and wish to obtain a username and password, please use the email contact form.

If you are not a client of PPI or CTI, limited access (which permits download access to many of these resources) may be available on an approved-registration basis. Conditions Apply. Please click here to complete a registration request form.

© Copyright 2010 Project Performance International. All rights reserved.
The contents of this Web Site are copyright of Project Performance (Australia) Pty Ltd and are made available for your information only, on the condition that you do not incorporate their contents, in whole or in part, into any other material of any nature without permission in writing from Project Performance (Australia) Pty Ltd. You are authorised to print the contents provided that this copyright notice is included.
Text quoted from Wikipedia articles for educational purposes is subject to copyleft under the GNU Free Documentation License
Site developed by Webel IT Australia