DIDs

Data Item Descriptions (DIDs)

REQUEST FOR TENDER for Supply and Support of a SmartBus Route 700 ICT System

Attachment(s)
FileSize (KB)MIME typeLanguage
T05358.pdf578.27application/pdfEnglishDOWNLOAD!
RFTCoverSheet 230704.PDF17.32application/pdfEnglishDOWNLOAD!

This Request for Tender contains information, that may be described variously as data, documents,
pages, facilities, and images, prepared by ACT Government Agencies for and on behalf of the
Territory. While the data contained in this Request for Tender has been formulated with all due
care, the Territory does not warrant or represent that it is free from misdescriptions, errors or
omissions.

The Territory is not in any way liable for the accuracy of any information printed or stored by a user ... read more

TENDERER’S RESPONSE to RFT for Supply and Support of a SmartBus Route 700 ICT System

WARNING: Date published: UNKNOWN
Attachment(s)
FileSize (KB)MIME typeLanguage
PartD_TenderersResponseSchedules 260704.doc719.5application/mswordEnglishDOWNLOAD!
PartD_TenderersResponseSchedules 260704.PDF281.71application/pdfEnglishDOWNLOAD!

Expense Arrangements for Consultancy Services

International or interstate travels, including accommodation, required in the provision of Consultancy Services will be provided by the Department at no cost to the Contractor for the Contract term. Unless the Request for Tender expressly states otherwise, all travel costs will be reimbursed on the basis applicable to the Department’s employees. ... read more

SMARTBUS ROUTE 700 ICT SYSTEM CONTRACT

WARNING: Date published: UNKNOWN
Attachment(s)
FileSize (KB)MIME typeLanguage
PartC_Conditions of Contract 300704.PDF468.68application/pdfEnglishDOWNLOAD!

The parties acknowledge that Director Furnished Information is furnished for the purpose
of describing the Director’s requirements under this Contract. The parties acknowledge
that the Director Furnished Information is not furnished to the Contractor for the purpose
of either directing, guiding or instructing the Contractor’s task under this Contract. The
Director does not warrant the suitability of such Director Furnished Information for any
particular use or application, nor does the Director warrant the accuracy or precision of
the Director Furnished Information. ... read more

Statement Of Work For Supply and Support of a SmartBus Route 700 ICT System

Attachment(s)
FileSize (KB)MIME typeLanguage
PartB_Statement_of_Work 290704.PDF197.67application/pdfEnglishDOWNLOAD!

Existing Pilot SmartBus ICT System

1.4.1.1. The existing Pilot SmartBus ICT System is installed on Routes 703, 888 and 889. Route
703 is operated by the Ventura Bus Lines and runs between Blackburn Station and
Clayton Shopping Centre via Forest Hill Shopping Centre. 20 buses are equipped for this
route.

1.4.1.2. Routes 888 and 889 are operated by Grenda’s Bus Services and run between
Nunawading Station and Springvale Shopping Centre via Forest Hill Shopping Centre
and Glen Waverley Station. 25 buses are equipped for this route. ... read more

SPECIFICATION for RFT for Supply and Support of a SmartBus Route 700 ICT System

Attachment(s)
FileSize (KB)MIME typeLanguage
PartB_Specification 290704.PDF34.8application/pdfEnglishDOWNLOAD!

The Public Transport Division (PTD), located within the Department of Infrastructure (DOI),
is responsible for the oversight and management of complex commercial arrangements for
the delivery of public transport services in Victoria.

These arrangements relate to the provision of train, tram and bus services throughout
Victoria by commercial operators. The expenditure on such services is some $1.35 billion
per annum. Over $3 billion of Victorian rail infrastructure assets are leased to franchise
operators of the Victorian rail services. In addition PTD has a regulatory role which ... read more

CONTRACT DATA REQUIREMENTS LIST

Attachment(s)
FileSize (KB)MIME typeLanguage
PartB_SOW_Annex_4_CDRL 290704.PDF98.4application/pdfEnglishDOWNLOAD!

Project Organisation

Nominate the Contractor position responsible for ensuring that the Project satisfies contractual
obligations and company objectives, and that it is effectively managed (i.e. the Project Owner).
Provide a diagram of the Project organisation showing all lines of management from Project Owner
downwards. Define the functions and responsibilities of the different groups which comprise the
Project team. Define the authority and responsibility of all Contractor’s Key Staff positions within the ... read more

Final System Design Document

Attachment(s)
FileSize (KB)MIME typeLanguage
USDOT_NG911_FINAL_System_Design.pdf4004.98application/pdfEnglishDOWNLOAD!

Equipment and infrastructure were deployed at several live PSAPs that provide 9-1-1 emergency services within their city, county, or state. The project team ensured that the daily operations of the PSAPs were not disrupted while conducting the POC tests. POC equipment deployed at the PSAPs was isolated from their live environments, and while call takers participated in the testing, no real 9-1-1 calls were taken using POC equipment. ... read more

Final Analysis of Cost, Value, and Risk Executive Summary

Attachment(s)
FileSize (KB)MIME typeLanguage
PartB_SOW_Annex_3_Route_700_Infrastructure Locations 280704.PDF29.18application/pdfEnglishDOWNLOAD!

The decision to deploy a new, Internet Protocol (IP)-based NG9-1-1 system is not a simple one
and is affected by many complex factors related to institutional and service arrangements,
equipment and infrastructure, and funding. This report examines the cost, value, and risk
associated with migrating to an NG9-1-1 national framework. It estimates a potential range of
lifecycle costs, identifies key values and risks inherent in each deployment scenario, and
compares the risk-adjusted lifecycle costs and values. These efforts draw on the USDOT ... read more

Department of Infrastructure

Attachment(s)
FileSize (KB)MIME typeLanguage
PartB_SOW Annex 5 Totem Drawings 280704.pdf3639.86application/pdfEnglishDOWNLOAD!

FRAMEWORK ASSEMBLY:

FABRICATED ALUMINIUM FRAMEWORK
ALL WELDS TO BE CLEANED GROUND SMOOTH
ALL EDGES TO BE RADIUSED
ALL SCREW HOLES TO HAVE NUTSERTS WERE REQ.
FINISH- POWDERCOATED
COLOUR- DULUX (METROPOLIS SILVER GLO PEARL)

Function and Performance Specification For Supply and Support of a SmartBus Route 700 ICT System

Attachment(s)
FileSize (KB)MIME typeLanguage
PartB_Function and Performance Specification 290704.PDF875.33application/pdfEnglishDOWNLOAD!

“Master Timetable” or “MT” means the electronic file which provides details of the scheduled
departure (origin and intermediate points) and arrival (at destination) times at all timing points for all service scheduled to operate on each day of the year. The Master Timetable is the equivalent of the information published to passengers in the timetable pamphlets and at stops provided by operators.
The Master Timetable comprises a Master Timetable Templates (TT) file and a Master Schedule (MS)
file. “Master Timetable Templates” or “TT” means the electronic file which provides details of the ... read more

SmartBus ICT System Timetable Data Item Definitions

Attachment(s)
FileSize (KB)MIME typeLanguage
PartB_FPS_Annex_TT_Management_Enclosure 210704.PDF169.71application/pdfEnglishDOWNLOAD!

The Daily Timetable (DT) file details the services scheduled for any given day as identified no later
than 5:00 PM on the day prior to the services being operated. This file will only be provided to the
System where a Bus Company plans to alter the services delivered from those specified in the Master
Timetable. Where no DT has been supplied by a Bus Company for a particular day, then the System
shall generate a DT based on the Master Timetable information loaded and validated at 5:00 PM on
the day prior to the services delivery. ... read more

SMARTBUS TIMETABLE MANAGEMENT

Attachment(s)
FileSize (KB)MIME typeLanguage
PartB_FPS_annex_2_EPIS_ICD 280704.PDF200.41application/pdfEnglishDOWNLOAD!

Master Timetable (MT)

The Master Timetable is the equivalent of the printed information published by Bus Operators to
passengers in the timetable pamphlets and at bus stops. For the purposes of SmartBus the Master
Timetable is constituted by a Master Timetable Templates (TT) file and a Master Schedule (MS) file.
A Master Timetable may be supplied for each separate depot. If Master Timetables are provided on a
depot by depot basis all subsequent files (TT, MS & DT) must also be provided on the same basis. ... read more

Performance and Cost Report

Attachment(s)
FileSize (KB)MIME typeLanguage
Performance and Cost Report.PDF126.03application/pdfEnglishDOWNLOAD!

Preparation Instruction:

10.1 Format
The performance and cost report format shall be contract selected. Unless effective presentation would be graded,
the initially used format arrangement shall be used for all subsequent submissions.

10.2 Content
The performance and cost shall contain the following:

10.2.1 Man-hours
Total man hours expended by technical categories or program tasks, cumulative total man-hours to date, and
percentages spent to date. State whether or not remaining hours are sufficient to complete the task.

10.2.2 Funds ... read more

DI-IPSC-81442 - Software Version Description (SVD) [as PDF]

Organization(s)
Attachment(s)
FileSize (KB)MIME typeLanguage
SVD_DID.PDF21.98application/pdfEnglishDOWNLOAD!
Duplicates
Referenced standards and/or methodologies

DI-IPSC-81429 - Software Transition Plan (STrP) [as PDF]

Organization(s)
Attachment(s)
FileSize (KB)MIME typeLanguage
STRP_DID.PDF28.68application/pdfEnglishDOWNLOAD!
Duplicates
Referenced standards and/or methodologies

DI-IPSC-81440 - Software Test Report (STR) [as PDF]

Organization(s)
Attachment(s)
FileSize (KB)MIME typeLanguage
STR_DID.PDF26.5application/pdfEnglishDOWNLOAD!
Duplicates
Referenced standards and/or methodologies

DI-IPSC-81438 - Software Test Plan (STP) [as PDF]

Organization(s)
Attachment(s)
FileSize (KB)MIME typeLanguage
STP_DID.PDF39.47application/pdfEnglishDOWNLOAD!
Duplicates
Referenced standards and/or methodologies

DI-IPSC-81439 - Software Test Description (STD) [as PDF]

Organization(s)
Attachment(s)
FileSize (KB)MIME typeLanguage
STD_DID.PDF37.24application/pdfEnglishDOWNLOAD!
Duplicates
Referenced standards and/or methodologies

DI-IPSC-81431 - System/Subsystem Specification (SSS) [as PDF]

Organization(s)
Attachment(s)
FileSize (KB)MIME typeLanguage
SSS_DID.PDF54.96application/pdfEnglishDOWNLOAD!
Duplicates
Referenced standards and/or methodologies

DI-IPSC-81432 - System/Subsystem Design Description (SSDD) [as PDF]

Organization(s)
Attachment(s)
FileSize (KB)MIME typeLanguage
SSDD_DID.PDF39.91application/pdfEnglishDOWNLOAD!
Duplicates
Referenced standards and/or methodologies
Syndicate content