Home

PROJECT PERFORMANCE INTERNATIONAL
SE Goldmine 2019

Systems engineering training for project success

Systems Engineering NEWSLETTER

SyEN makes informative reading for the project professional, containing scores of news and other items summarizing developments in the field of systems engineering and in directly related fields.


  • SE Goldmine Home
  • Documents
  • Standards
  • Organizations
  • Register
  • Login
  • About PPI
  • On-site Training
  • Email PPI
  • Contact PPI
  • PPI home
Home › SE Standards › US Mil Stds, Hdbks etc (Verif) ›

Standard: MIL-STD-881A - Work Breakdown Structures for Defense Materiel Items

Status (as a standard)
status: 
replaced
Defining document(s)
Document titlesort icon Identifier Document date Status Size Files
MIL-STD-881A - Work Breakdown Structures for Defense Materiel Items MIL-STD-881A 1975-04-25 replaced 5.08 MB DOWNLOAD!
Supersedes standard(s)
Standard: MIL-STD-881 - Work Breakdown Structures for Defense Materiel Items
Related organizations
U.S. Department of Defense (DoD)
Documents
Document Titlesort icon Document Identifier Document Date Size File
MIL-STD-881A - Work Breakdown Structures for Defense Materiel Items MIL-STD-881A 1975-04-25 5.08 MB DOWNLOAD!
External documents
  • MIL-STD-881A - Work Breakdown Structures for Defense Materiel Items
‹ MIL-STD-881 up MIL-STD-881A - Work Breakdown Structures for Defense Materiel Items ›
  • Printer-friendly version

Search SE Goldmine

Goldmine menu

  • Project Performance International (PPI)
  • Software Engineering
  • Systems Engineering
  • Acquisition
  • Bibliographies and Reviews
  • Capability Maturity Models (CMMs)
  • Cartoons
  • Emailing Lists
  • Example SE Documents
  • Forms
  • Guides, Handbooks, Reports & Papers
  • INCOSE
  • Professional Societies
  • Project Outcomes Data
  • SE Definitions documents
  • SE Software Tools
  • SE Standards
    • Data Item Descriptions (DIDs)
    • BSI Standards
    • EIA Standards
    • IEEE Standards
    • ISO Standards
    • MIL-STD Defense System Software Development
    • NASA SE Standards
    • OMG SE Standards
    • Other SE Standards
    • SAE standards
    • SE Standards Organisations
    • Standards Comparisons & Guidance
    • Standards Listings
    • UK DEFSTANs
    • US Mil Stds, Hdbks etc (Verif)
      • DOD-HDBK-743A Anthropometry of U.S. Military Personnel
      • DOD-HDBK-763 Human Engineering Procedures Guide
      • DOD-HDBK-763_NOTICE-1
      • DoD: 5000.1, 5000.2 Defense Acquisition
      • MIL-H-46855B - Human Engineering Requirements for Military Systems, Equipment, and Facilities - Amendment 2
      • MIL-H-46855B - Human Engineering Requirements for Military Systems, Equipment, and Facilities
      • MIL-HDBK-1467 - Software Common Operating Environment [DRAFT]
      • MIL-HDBK-217F
      • MIL-HDBK-245B
      • MIL-HDBK-245C - Preparation of Statement of Work (SOW)
      • MIL-HDBK-245D - Handbook for Preparation of Statement of Work (SOW)
      • MIL-HDBK-245D - Handbook for Preparation of Statement of Work (SOW) [as PDF]
      • MIL-HDBK-245E - Preparation of Statement of Work
      • MIL-HDBK-46855 - HUMAN ENGINEERING GUIDELINES FOR MILITARY SYSTEMS, EQUIPMENT, AND FACILITIES
      • MIL-HDBK-46855A - HUMAN ENGINEERING PROGRAM PROCESS AND PROCEDURES
      • MIL-HDBK-499-3 - Systems Engineering/Configuration Management Life Cycle Application [DRAFT]
      • MIL-HDBK-59A
      • MIL-HDBK-59B - Continuous Acquisition and Life-Cycle Support (CALS) Implementation Guide
      • MIL-HDBK-61 - Configuration Management Guidance
      • MIL-HDBK-727 - Design Guidance for Producibility
      • MIL-HDBK-759B Human Factors Engineering Design for Army Materiel
      • MIL-HDBK-761A Human Engineering Guidelines for Management Information Systems
      • MIL-HDBK-781
      • MIL-HDBK-781A - Handbook For Reliability Test Methods, Plans and Environments for Engineering, Development Qualification and Production
      • MIL-HDBK-782 (AR) - Software Support Environment Acquisition
      • MIL-HDBK-881 - Work Breakdown Structure
      • MIL-HDBK-881A - Work Breakdown Structure for Defense Materiel Items
      • Standard: DOD-1679A
      • Standard: DOD-STD-1467 (AR) "Software Support Environment"
      • Standard: DOD-STD-1702(NS)
      • Standard: MIL-PRF-49506
      • Standard: MIL-STD-1295A - Human Factors Engineering Design Criteria for Helicopter Cockpit Electro-Optical Display Symbology
      • Standard: MIL-STD-1388
      • Standard: MIL-STD-1388-1 - Logistic Support Analysis
      • Standard: MIL-STD-1388-1A - Logistics Support Analysis
      • Standard: MIL-STD-1388-1B
      • Standard: MIL-STD-1388-2A
      • Standard: MIL-STD-1388-2B - DOD REQUIREMENTS FOR A LOGISTIC SUPPORT ANALYSIS RECORD
      • Standard: MIL-STD-1390B (NAVY) Marine Corps Level of Repair System Users Manual, MCLORIA (Marine Corps)
      • Standard: MIL-STD-1390D - Level of Repair Analysis (LORA)
      • Standard: MIL-STD-1456
      • Standard: MIL-STD-1456A - Configuration Management Plan
      • Standard: MIL-STD-1472
      • Standard: MIL-STD-1472D Human Engineering Design Criteria for Military Systems, Equipment and Facilities
      • Standard: MIL-STD-1478 - Task Performance Analysis
      • Standard: MIL-STD-1521 (USAF) - Technical Reviews and Audits for Systems, Equipment, and Computer Programs
      • Standard: MIL-STD-1521A (USAF) - Technical Reviews and Audits for Systems, Equipment, and Computer Programs
      • Standard: MIL-STD-1521B (USAF) - Technical Reviews and Audits for Systems, Equipment, and Computer Programs
      • Standard: MIL-STD-1528 (USAF)
      • Standard: MIL-STD-1528A (USAF) - Manufacturing Management Program
      • Standard: MIL-STD-1546A
      • Standard: MIL-STD-1574A
      • Standard: MIL-STD-1785
      • Standard: MIL-STD-1785A - Program Protection/System Security Engineering Management
      • Standard: MIL-STD-1794 Human Factors Engineering Program for Intercontinental Ballistic Missile Systems
      • Standard: MIL-STD-1908 Definitions of Human Factors Terms
      • Standard: MIL-STD-2155(AS) - Failure Reporting, Analysis, and Corrective Action System (FRACAS)
      • Standard: MIL-STD-2165 - Military Standard Testability Program for Electronic Systems and Equipments
      • Standard: MIL-STD-2549 - Configuration Management Data Interface
      • Standard: MIL-STD-461B - Electromagnetic Emission and Susceptibility Requirements for the Control of Electromagnetic Interference
      • Standard: MIL-STD-461C - Electromagnetic Emission and Susceptibility Requirements for the Control of Electromagnetic Interference
      • Standard: MIL-STD-461D - Requirements for the Control of Electromagnetic Interference Emissions and Susceptibility
      • Standard: MIL-STD-462
      • Standard: MIL-STD-462D - Department of Defense Test Method Standard for Measurement of Electromagnetic Interference Characteristics
      • Standard: MIL-STD-470A - Maintainability Program for Systems and Equipment
      • Standard: MIL-STD-470B - Maintainability Program for Systems and Equipment
      • Standard: MIL-STD-480 - Configuration Control - Engineering Changes, Deviations, and Waivers
      • Standard: MIL-STD-483 (USAF) - Configuration Management Practices For Systems
      • Standard: MIL-STD-483A - Configuration Management Practices For Systems, Equipment, Munitions, and Computer Programs
      • Standard: MIL-STD-490
      • Standard: MIL-STD-490A - SPECIFICATION PRACTICES
      • Standard: MIL-STD-490B - PROGRAM-UNIQUE SPECIFICATIONS, PREPARATION OF
      • Standard: MIL-STD-499
      • Standard: MIL-STD-499A - Engineering Management
      • Standard: MIL-STD-499B - Systems Engineering
      • Standard: MIL-STD-680
      • Standard: MIL-STD-781D
      • Standard: MIL-STD-785 - Reliability Program for Systems and Equipment Development and Production
      • Standard: MIL-STD-847A
      • Standard: MIL-STD-881 - Work Breakdown Structures for Defense Materiel Items
      • Standard: MIL-STD-881A - Work Breakdown Structures for Defense Materiel Items
        • MIL-STD-881A - Work Breakdown Structures for Defense Materiel Items
      • Standard: MIL-STD-881B
      • Standard: MIL-STD-882 "System Safety Program Requirements"/"Standard Practice for System Safety"
      • Standard: MIL-STD-882A
      • Standard: MIL-STD-882B - System Safety Program Requirements
      • Standard: MIL-STD-882C - System Safety Program Requirements
      • Standard: MIL-STD-882D - Standard Practice for System Safety
      • Standard: MIL-STD-961- Department of Defense Standard Practice for Defense Specifications
      • Standard: MIL-STD-961C
      • Standard: MIL-STD-961D - Department of Defense Standard Practice for Defense Specifications
      • Standard: MIL-STD-962B
      • Standard: MIL-STD-962C - Department of Defense Standard Practice - Defense Standards and Handbooks
      • Standard: MIL-STD-963A
      • Standard: MIL-STD-963B - Department of Defense Standard Practice - Data Item Descriptions (DIDs)
      • Standard: MIL-STD-965
      • Standard: MIL-STD-965A - Parts Control Program
      • Standard: MIL-STD-973 - Configuration Management
      • Technical Report Describing Contents of MIL-HDBK-171 (DRAFT) - Work Breakdown Structure Elements for Software
      • USAF Standards
    • SE Landmark Standards (Dup)
  • Software Standards
  • Specialty Engineering
  • SWE Guides, Handbooks, Reports & Papers
  • Software Engineering Tools
  • Links (related)

Standards quick search

  • ADF (1)
  • AS (3)
  • BSI (2)
  • AFR (3)
  • AIAA (0)
  • ANSI (4)
  • ARMY (0)
  • CMU/SEI (16)
  • DIDs (176)
  • DoD (166)
    • DOD-HDBK (3)
  • ECSS (0)
  • EIA (29)
  • ESA (0)
  • FIPS PUBS (2)
  • IDEF (18)
  • IEEE (73)
  • ISO (20)
  • MIL-HDBK (28)
  • MIL-STD (151)
  • MIL-PRF (1)
  • MoD (103)
    • UK DEFSTAN (103)
  • NASA (4)
  • NIST (1)
  • OMG (16)
  • SAE (17)
  • USAF (1)
  • USN (0)
  • Other (21)

User Login

 Enter username without spaces:

Search by content type

  • Documents search - All
    • Search Documents (table view)
    • Browse Documents (table view)
    • Search Documents (list view)
    • Browse Documents (list view)
    • Search Documents (abstracts & extracts)
    • Browse Documents (abstracts & extracts)
  • Standards & Methodologies search - all
    • Standards (superseded) info
    • Standards (cancelled) info
  • Organizations search
  • Publishers search
  • People search
  • Journals search

Training Quicklinks

  • Systems Engineering
  • Software Engineering
  • Requirements, OCD & CONOPS
  • Tender evaluation
  • Requirements Engineering
  • Requirements Analysis
  • Specification Writing
  • Cognitive Systems Engineering
  • PRINCE2™ Project Management

Access the SE Goldmine

A username and password is required for access to the resources. If you are a client of PPI or subsidiary company CTI and wish to obtain a username and password, please use the email contact form.

If you are not a client of PPI or CTI, limited access (which permits download access to many of these resources) may be available on an approved-registration basis. Conditions Apply. Please click here to complete a registration request form.

Most access requests are approved. Logon details will be provided by email. We apologise for being unable to respond to access requests that are declined.

© Copyright 2010 - 2019 Project Performance International. All rights reserved.
The contents of this Web Site are copyright of Project Performance (Australia) Pty Ltd and are made available for your information only, on the condition that you do not incorporate their contents, in whole or in part, into any other material of any nature without permission in writing from Project Performance (Australia) Pty Ltd. You are authorised to print the contents provided that this copyright notice is included.
Text quoted from Wikipedia articles for educational purposes is subject to copyleft under the GNU Free Documentation License
Site developed by Webel IT Australia