Systems Engineering NEWSLETTER
SyEN makes informative reading for the project professional, containing scores of news and other items summarizing developments in the field of systems engineering and in directly related fields.
| |||
|
Systems Engineering NEWSLETTERSyEN makes informative reading for the project professional, containing scores of news and other items summarizing developments in the field of systems engineering and in directly related fields. |
Requirements:
1. Reference Documents. The applicable issue of the documents cited herein, including their
approval dates and dates of any applicable amendments, notices, and revisions, shall be as
cited in the current issue of the DODISS at the time of the solicitation.
2. Format. The report shall be in the Contractor’s format.
3. Content. The report shall cover these elements.
3.1. The Contractor’s proposed implementation Scope of Work.
3.2. System Description. All components or elements of the system being implemented, and their interfaces with existing systems shall be described to include a physical and functional description
A username and password is required for access to the resources. If you are a client of PPI or subsidiary company CTI and wish to obtain a username and password, please use the email contact form.
If you are not a client of PPI or CTI, limited access (which permits download access to many of these resources) may be available on an approved-registration basis. Conditions Apply. Please click here to complete a registration request form.
Most access requests are approved. Logon details will be provided by email. We apologise for being unable to respond to access requests that are declined.