DID- Contractor's Standard Operating Procedures

Organization(s)
Attachment(s)
FileSize (KB)MIME typeLanguage
DID- Contractor's Standard Operating Procedures.PDF224.23application/pdfEnglishDOWNLOAD!
Cover images

Requirements

1. Format. Contractor format is acceptance.

2. Media Requirements. The Standard Operation Procedures (SOP) shall be in the digital data format as specified in the contract.

3. Content. Standard Operating Procedures (SOPs) shall be presented for each functional element of the mission to be performed. The SOPs shall contain all applicable information for the following:
a) receipt
b) storage and core of material issue
c) location survey
d) shipping inventory
e) safety transportation deliveries
f) training requirements

Introduction

Use, Relationship: This Data Item Description (DID) contains the format and content preparation instructions for the data generated by the specific and discrete task requirements as delineated in the contract.

Rating
0