The following definitions are used in this document:
Acceptance Into Operational Service
The process by which the Fundamental Inputs to Capability (FIC) comprising a Capability System are proven to meet endorsed capability requirements, usually specified in an OCD, and assembled such that in all aspects the capability has been realised and is acceptable for operational service.
[DI(G) OPS 45-2]
Acquisition Baseline The approved configuration documentation describing
the performance (functional, inter operability, and interface characteristics) of the System(s) to be acquired, the commercial conditions governing the acquisition, and the Verification required to demonstrate the achievement of those specified
characteristics. The Acquisition Baseline is established immediately prior to release of solicitation documentation (draft or final) to industry and will usually require modification to reflect changes arising from contract negotiation.
Defines standard
Replaced/Superseded by document(s)
Cancelled by
Amended by
| File | MIME type | Size (KB) | Language | Download | |
|---|---|---|---|---|---|
| CDD_Guide_V1-4.pdf | application/pdf | 3.28 MB | English | DOWNLOAD! |