Welcome to our new site version. Your web page bookmarks may have changed, please search for pages by title to update them. Having problems ? Please try clearing your web browser cache and hard-reloading your web page first before contacting our webmaster.

ED03- Standard for Contractor Configuration Management for MSFC Programs Projects

[document] Submitted on 5 September, 2017 - 18:50
Keywords configuration management contractor management

4. GENERAL REQUIREMENTS
The contractor shall establish a CM program covering the appropriate life-cycle phases of the applicable Configuration Items (CIs) and Computer Software Configuration Items (CSCIs). In this document, CI is a broad term that includes CSCI whenever appropriate. The requirements of this document shall be implemented and tailored as stated in the contract Statement of Work (SOW) and consist of the following elements:

a. Configuration Identification
b. Configuration Control
c. Configuration Status Accounting
d. Configuration Verification; Configuration Verification/Validation for Software/Firmware
The contractor shall assure that all appropriate subcontractors comply with the requirements of this CM program.

Metadata
Document identifier
MIL-STD-3384
Date published
2005-01-31
Language of Attachment(s)
English
Document type
military standard
Pages
71
Replaced/Superseded by document(s)
Cancelled by
Amended by
File MIME type Size (KB) Language Download
ED03- Standard for Contractor Configuration Management for MSFC Programs Projects.pdf application/pdf   1.08 MB English DOWNLOAD!
File attachments
Cover images
Introduction

1. SCOPE/PURPOSE
1.1 Scope/Purpose.
The purpose of this document is to establish requirements for implementing Configuration Management (CM) on MSFC contracts to design, develop, fabricate, integrate, operate, or provide logistical support to hardware, software, and firmware items. This document also establishes requirements for MSFC contracts providing technology or requirements that are precursors of program design.

1.2 Applicability.
This document is applicable to all MSFC contractors performing design, development, fabrication, integration, operations, or logistical products and services for MSFC programs or projects. These standards apply to flight, flight demos, protoflight, and ground support equipment and may be tailored by the individual programs/projects.

Organisation(s)
Defines standard
Visit also