4. GENERAL REQUIREMENTS
4.1 Engineering Documents Usage.
a. The drawing, EPL (MSFC Form 420), Engineering Order (EO) (MSFC Form 421), and specification (which includes all book form requirements) are the primary engineering “as-designed” documents described herein and in MWI 7120.4, all of which are released through the Integrated Configuration Management System (ICMS).
b. At the request of the project manager, the S&MA office or designee is responsible for generating the as-built documentation list from the inspection records. The CM project support organization shall be responsible for performing the as-designed/as-built comparison at the request of the project manager in support of a physical configuration audit. The project manager in coordination with S&MA and CM shall allow sufficient time in the project schedules to perform inspections, physical configuration audits, and to resolve discrepancies.
Defines standard
Replaced/Superseded by document(s)
Cancelled by
Amended by
File | MIME type | Size (KB) | Language | Download | |
---|---|---|---|---|---|
MSFC STD- Engineering Documentation Standard.pdf | application/pdf | 324.99 KB | English | DOWNLOAD! |
Provides definitions
Introduction
1. SCOPE
This document specifies the requirements and instructions for releasing Marshall Space Flight Center (MSFC) configuration documentation as specified in MWI 7120.4. It also specifies the requirements for preparing engineering drawings and parts lists. This standard is intended for MSFC in-house use only.