1. MAKE THE FOLLOWING PEN AND INK CHANGES
a. Page iv. delete para 6.4 and renumber para 6.5 to Para 6.4.
b. Page v, para 50.2.3, rename the title to “Safety Requirements/Criteria Analysis (Task 203)
c. Page vi, para 50.3.3. rename the tile to “Safety Review of Engineering Change Proposal, Specification Change Notices, Software Problem Report. and Requests for Deviation/Waiver”.
d. Page 11. para 4.5.1, third line, change Table 4.1-to Table 1“.
e. Page 11, para 4.5.2, seventh line, change Table 4.2” to Table 2“.
f. Page 402-1. para 402.2. sixth line, change the term “RHA to “SRCA”.
g. Page 403-2, para 403.2.4, renumber the second paragraph “403.2.4-to “403.2.5- and renumber the existing para ‘403.2.5” to “4032.6-.
Defines standard
Replaced/Superseded by document(s)
Cancelled by
Amended by
File | MIME type | Size (KB) | Language | Download | |
---|---|---|---|---|---|
MIL STD- System Safety Program Requirements.pdf | application/pdf | 94.06 KB | English | DOWNLOAD! |