FAA STD- Appendix VII (Engineering Changes- Equipment)

Keywords engineering changes equipment FAA

80.3 Requirement for engineering changes
The contractor shall not incorporate any engineering change in a configuration item as described in the configuration identification prescribed by the contract, unless required for an engineering change has been submitted to, and approved by FAA, as set forth herein. Contractual authorization will be required prior to incorporation of an engineering change proposal (ECP) when affects cost, fee schedule technical requirements, or training methodology.

Metadata
Document identifier
FFA-STD-021a
Version
Change 1
Date published
1990-03-06
Language
English
Document type
defense standard
Pages
1
Defines standard
Replaced/Superseded by document(s)
Cancelled by
Amended by
File MIME type Size (KB) Language Download
FAA STD- Appendix VII (Engineering Changes- Equipment).pdf application/pdf   143.97 KB English DOWNLOAD!
File attachments
Cover images
Introduction

80.1 Purpose
This appendix provides information for configuration control of engineering changes MIL STD-48- should be referenced for further information. These instructions pertain to all engineering changes to hardware. Engineering changes to computer software are covered in Appendix IX of this standard.

Organisation(s)
Visit also