80.3 Requirement for engineering changes
The contractor shall not incorporate any engineering change in a configuration item as described in the configuration identification prescribed by the contract, unless required for an engineering change has been submitted to, and approved by FAA, as set forth herein. Contractual authorization will be required prior to incorporation of an engineering change proposal (ECP) when affects cost, fee schedule technical requirements, or training methodology.
Defines standard
Replaced/Superseded by document(s)
Cancelled by
Amended by
File | MIME type | Size (KB) | Language | Download | |
---|---|---|---|---|---|
FAA STD- Appendix VII (Engineering Changes- Equipment).pdf | application/pdf | 143.97 KB | English | DOWNLOAD! |
Provides definitions
Introduction
80.1 Purpose
This appendix provides information for configuration control of engineering changes MIL STD-48- should be referenced for further information. These instructions pertain to all engineering changes to hardware. Engineering changes to computer software are covered in Appendix IX of this standard.