DID- Funds & Labor Hour Expenditure Report

Keywords DID funds hour expenditure labour report

7. Application/Interrelationship

7.1 This DID contains the format and content preparation instructions for the data product generated by the specific and discrete task requirement and delineated in the contract.

7.2. This DID is applicable to time and material, research and development and other contracts where use of Cost Performance Reporting (CPR) or Cost/Schedule Status Report (C/SSR) is not appropriate and as an alternative to DI-FNCL-80331, Funds and Man-Hour Expenditure Report. It is not applicable to fixed-price contracts. IT is acquired on a periodic (normally monthly) basis.

7.3 It is not intended that all the requirements contained herein should be applied to every contract or program phase. Portions of this DID are subject to deletion tailoring depending on the management requirements of the solicitation/contract in which it is applied.

Metadata
Document identifier
DI-FNCL-81537
Date published
1997-03-13
Language
English
Document type
Data Item Description (DID)
Pages
7
Defines standard
Replaced/Superseded by document(s)
Cancelled by
Amended by
File MIME type Size (KB) Language Download
DID- Funds & Labour Hour Expenditure Report.PDF application/pdf   789.61 KB English DOWNLOAD!
File attachments
Cover images
Organisation(s)
Visit also