Welcome to our new site version. Your web page bookmarks may have changed, please search for pages by title to update them. Having problems ? Please try clearing your web browser cache and hard-reloading your web page first before contacting our webmaster.

DID- Rework Repair and Scrap Cost Report

[document] Submitted on 2 November, 2017 - 10:20
Keywords cost report DID rework repair scrap cost

10. Preparation Instructions

10.1 General
For the purpose of this Rework./Repair and Scrap Cost Report, the following criteria are applicableL

a. The costs associated with rework and the costs associated with repair shall be combined into a total rework/repair cos.

b. Scrap which is generated as a result of contractually required destructive testing or as a result of normal production operations not involving nonconforming material (e.g. cutting, trimming, etc.) shall not be included in scrap cost.

c. Rework/repair and scrap costs do not apply to Government Furnished Material (GFM) which is defective upon receipt. These costs shall apply to GFM which is required to be reworked/repaired or scrapped after receipt due to contractor's activities.

Metadata
Document identifier
DI-FNCL-80753A
Date published
1989-07-27
Language of Attachment(s)
English
Document type
Data Item Description (DID)
Pages
4
Defines standard
Replaced/Superseded by document(s)
Cancelled by
Amended by
File MIME type Size (KB) Language Download
DID- Rework Repair and Scrap Cost Report.PDF application/pdf   342.42 KB English DOWNLOAD!
File attachments
Cover images
Organisation(s)
Visit also