10. Preparation Instruction
10.1 Format
The SEMP format shall be contractor selected. Unless effective presentation would be degraded, the initially used format arrangement shall be used for all subsequent submissions.
10.2 Content
The SEMP shall contain the following parts:
10.2.1 Part I- System Engineering
This part of the SEMP shall describe the contractor's system engineering process as it is proposed to be applied to the definition of system design and test requirements during the contractual effort. It shall include the system engineering required to define the system performance parameters and preferred system configuration to satisfy the contractual requirements; the planning and controls of the effort of design engineering (all disciplines), test engineering, logistics engineering and production engineering to meet cost, technical performance, and schedule objectives.
Defines standard
Replaced/Superseded by document(s)
Cancelled by
Amended by
File | MIME type | Size (KB) | Language | Download | |
---|---|---|---|---|---|
DID- System Engineering Management Plan (SEMP).PDF | application/pdf | 327.67 KB | English | DOWNLOAD! |