Welcome to our new site version. Your web page bookmarks may have changed, please search for pages by title to update them. Having problems ? Please try clearing your web browser cache and hard-reloading your web page first before contacting our webmaster.

DID- System Engineering Management Plan (SEMP)

[document] Submitted on 2 November, 2017 - 10:27
Keywords DID management plan SEMP system engineering management plan

10. Preparation Instruction

10.1 Format
The SEMP format shall be contractor selected. Unless effective presentation would be degraded, the initially used format arrangement shall be used for all subsequent submissions.

10.2 Content
The SEMP shall contain the following parts:

10.2.1 Part I- System Engineering
This part of the SEMP shall describe the contractor's system engineering process as it is proposed to be applied to the definition of system design and test requirements during the contractual effort. It shall include the system engineering required to define the system performance parameters and preferred system configuration to satisfy the contractual requirements; the planning and controls of the effort of design engineering (all disciplines), test engineering, logistics engineering and production engineering to meet cost, technical performance, and schedule objectives.

Metadata
Document identifier
DI-MGMT-81024
Date published
1990-08-27
Language of Attachment(s)
English
Document type
Data Item Description (DID)
Pages
6
Defines standard
Replaced/Superseded by document(s)
Cancelled by
Amended by
File MIME type Size (KB) Language Download
DID- System Engineering Management Plan (SEMP).PDF application/pdf   327.67 KB English DOWNLOAD!
File attachments
Cover images
Organisation(s)
Visit also