Keywords
change proposal
engineering change
system safety report
Description/Purpose
3.1 The ECPSSR can be used to summarize result of analyses, tests and tradeoff studies conducted on proposed engineering design changes throughout the system life cycle.
Defines standard
Replaced/Superseded by document(s)
Cancelled by
Amended by
File | MIME type | Size (KB) | Language | Download | |
---|---|---|---|---|---|
DID- Engineering Change Proposal System Safety Report (ECPSSR).pdf | application/pdf | 315.01 KB | English | DOWNLOAD! |
Provides definitions
Introduction
10. Preparation Instructions
10.1 Source document
The applicable issue of the documents cited herein, including their approval dates and dates of any applicable amendments and revisions, shall be as reflected in the contract.