Requirements:
1. Reference documents. The applicable issue of any documents cited herein, including their approval dates and dates of any applicable amendments, notices, and revisions, shall be as specified in the contract.
2. Format and content. The Installation Completion Notification (ICN) shall be prepared in contractor format. The content shall include, where applicable, the following information:
a. identification of retrofit instruction implemented and of related ECP
b. identification of configuration item or top assembly modified
c. part identifier and serial number of part modified/replaced
d. part identifier and serial number of part incorporated
The following references may be useful in defining content: MIL-HDBK-61, Configuration Management Guidance (paragraph 4.2.1.5 and Table 4-8) and ANSI/EIA-649-1998, National Consensus Standard for Configuration Management (paragraph 5.3.3) may be used to select/describe the detailed information elements.
END OF DI-CMAN-81245A.
Defines standard
Replaced/Superseded by document(s)
Cancelled by
Amended by
File | MIME type | Size (KB) | Language | Download | |
---|---|---|---|---|---|
DID- INSTALLATION COMPLETION NOTIFICATION (ICN).pdf | application/pdf | 6.57 KB | English | DOWNLOAD! |
Provides definitions
Introduction
Use, Relationships :
An Installation Completion Notification (ICN) is used to report field accomplishment of retrofit changes by contractor personnel as required by an approved. Engineering Change Proposal (ECP). The notification is provided to the Government when the Government is maintaining the configuration status accounting information about the configuration of units in the operational inventory.
This Data Item Description (DID) contains the format, content and preparation instructions for an ICN resulting from work tasks specified in the contract.