7. APPLICATION/INTERRELATIONSHIP
7.1 This Data Item Description (DID) contains the format and content preparation instructions for the data
resulting from the work task described by 3.7.3 of MIL-DTL-31000A.
7.2 This DID is applicable to acquisitions in which the Government intends to retain approval authority over the
designation of manufacturing processes as mandatory.
10. PREPARATION INSTRUCTIONS
10.1 Reference Documents. The applicable issue of documents cited herein, including their approval dates and the dates
of applicable amendments, notices and revisions, shall be as cited in the contract.
10.2 General. The PCMPD shall meet the requirements of MIL-DTL-31000A.
10.3 Format. The PCMPD shall be in the contractor’s format.
10.4 Content. The PCMPD shall include as applicable:
a. Contractor’s name, address and CAGE Code.
b. Contract number.
Defines standard
Replaced/Superseded by document(s)
Cancelled by
Amended by
File | MIME type | Size (KB) | Language | Download | |
---|---|---|---|---|---|
DID- Proposed critical manufacturing process description.pdf | application/pdf | 9.67 KB | English | DOWNLOAD! |
Provides definitions
Introduction
3. DESCRIPTION/PURPOSE
3.1 The Proposed Critical Manufacturing Process Description (PCMPD) identifies processes which are proposed for
inclusion in the technical data package (TDP) as mandatory to meet the engineering requirements of the item or a
component part thereof for which the TDP is being prepared.