As Built Configuration List (ABCL)

Keywords abcl as built configuration list configuration list

7. Application / Interrelationship

7.1 This DID contains the format and content preparation instructions for the data product generated by the
specific and discrete task requirement as delineated in the contract.

7.2 GIDEP address: Program Director, GIDEP Operations Center, Corona, CA 91718-5000

10. PREPARATION INSTRUCTIONS

10.1 Format. The report shall be in contractor format.

10.2 Content. The report shall contain the following:

10.2.1 Part name, part number and revision, serial number, lot number, manufacture date, manufacturer, vendor
contract number, next higher assembly part number and serial number, indenture level, ECPS, waivers, deviations,
soffware part number and revision as applicable for each serial-number-co~ trolled or lot-number-controlled all-up
round, section, assembly, subassembly, part or component installed in the end item at time of delivery to the
government.

Metadata
Document identifier
DI-CMAN-81516
Date published
1996-07-15
Language
English
Document type
Data Item Description (DID)
Pages
1
Defines standard
Replaced/Superseded by document(s)
Cancelled by
Amended by
File MIME type Size (KB) Language Download
DID- AS built configuration list.pdf application/pdf   81.26 KB English DOWNLOAD!
File attachments
Introduction

3.DESCRIPTION/ PURPOSE

3.1 The list shows the as-built configuration specific to each individual end item delivered under the contract.

Organisation(s)
Visit also