CONFIGURATION MANAGEMENT ACTION ITEM STATUS DATA INFORMATION PACKET

Keywords configuration management configuration management action item status item status data information packet

7. APPLICATION/INTERRELATIONSHIP

7.1 This Data Item Description (DID) contains the format, content, and interrelationship requirements for Configuration
Management Action Item Status information resulting from the work task described in the contract SOW. This DID is
applicable to the acquisition and support of systems, equipment, software, and components for military use.

7.2 It is not intended that all of the requirements contained herein should be applied to every program. This DID should
be tailored to the minimum acceptable data requirements of the applicable contract or purchase order. Data information
subpacket selection and ordering guidance can be found in MIL-STD-2549, Appendix A.

10. PREPARATION INSTRUCTIONS

10.1 Reference Documents. The applicable issue of the documents cited herein, including their approval dates and the
dates of applicable amendments and revisions, shall be as cited in the current issue of the DODISS at the time of the
solicitation.

10.2 Format and content. The format and content (including the sequencing of data fields) of the specific data information
subpackets ordered in the CDRL shall be in accordance with the requirements of Table DIP5-I of MIL-STD-2549.
Subpacket 5A. ECP/RFD Implementation Actions

Subpacket 5B. Configuration Audit Actions

Metadata
Document identifier
DI-CMAN-81555
Date published
1997-06-30
Language
English
Document type
Data Item Description (DID)
Pages
1
Defines standard
Replaced/Superseded by document(s)
Cancelled by
Amended by
File MIME type Size (KB) Language Download
DID- CONFIGURATION MANAGEMENT ACTION ITEM STATUS DATA INFORMATION PACKET.pdf application/pdf   8.33 KB English DOWNLOAD!
File attachments
Introduction

3. DESCRIPTION/PURPOSE

Configuration management action tracking information provides a record of actions and suspenses directed as a result of
various configuration management activities and provides traceability of their status until they are closed out.

Organisation(s)
Visit also