Program Evaluation and Review Technique (PERT)/Time Analysis Report

Keywords analysis report evaluation pert master program evaluation review technique
Standards groups

Problem Areas and Corrective Action:

All major problem areas disclosed by analysis of the critical path and slack sorts shall be identified to the network and the action taken and proposed solutions reported. This section shall cover actions that the contractor is taking to avoid slippages and recommendations for Government action. This shall include proposed changes in plans which, if approved, will be reflected in the next PERT Network, changes in resource (manpower, money)application and possible additional resource authorizations required to achieve timely completion. Problems reported previously shall be carried forward until rectified.

Metadata
Document identifier
DI-MGMT-80506
Date published
1988-01-15
Language
English
Document type
Data Item Description (DID)
Pages
2
Defines standard
Replaced/Superseded by document(s)
Cancelled by
Amended by
File MIME type Size (KB) Language Download
Program Evaluation,RTA.PDF application/pdf   175.16 KB English DOWNLOAD!
File attachments
Cover images
Introduction

The Program Evaluation and review technique (PERT)/Time Analysis Report is used by the Government to Evaluate the progress of the contracts which include requirements for the PERT Master and Work Package Networks.

Visit also