Welcome to our new site version. Your web page bookmarks may have changed, please search for pages by title to update them. Having problems ? Please try clearing your web browser cache and hard-reloading your web page first before contacting our webmaster.

System of Systems & Industry Feedback

[document] Submitted on 2 March, 2019 - 10:35
Keywords feedback industry feedback system of systems systems and industry feedback
Standards groups

•Functional Interface
–Electronic
–Electrical
–Hydraulic, Pneumatic
–Optical, Electro-Optical
–Man Machine
•Physical Interface
-Size, weight, CG, mounting, access
•Environmental Interface

Metadata
Document identifier
256-313-4976
Date published
2004
Language of Attachment(s)
English
Document type
Data Item Description (DID)
Pages
42
Replaced/Superseded by document(s)
Cancelled by
Amended by
File MIME type Size (KB) Language Download
Systems of Systems and Industry Feedback.pdf application/pdf   2.69 MB English DOWNLOAD!
File attachments
Cover images
Introduction

Despite high maturity prime contractors (i.e. CMMI Level 5) there are still significant problems on major DoD programs
•Systems Engineering is often not performed because:
–PM will not fund (viewed as “overhead”)
–Programs tend to be “back-loaded”, insufficient front-end funds
–PM voids contractor process maturity by tailoring critical itemsout of a program
–PM typically feels need to start coding/designing immediately
–Many major primes will not engage their subs in the top-level SE process (believing this to be sole responsibility of the prime)

Author(s)
W. Odis Nickoles
Defines standard
Visit also