•Functional Interface
–Electronic
–Electrical
–Hydraulic, Pneumatic
–Optical, Electro-Optical
–Man Machine
•Physical Interface
-Size, weight, CG, mounting, access
•Environmental Interface
Defines standard
Replaced/Superseded by document(s)
Cancelled by
Amended by
File | MIME type | Size (KB) | Language | Download | |
---|---|---|---|---|---|
Systems of Systems and Industry Feedback.pdf | application/pdf | 2.69 MB | English | DOWNLOAD! |
Provides definitions
Introduction
Despite high maturity prime contractors (i.e. CMMI Level 5) there are still significant problems on major DoD programs
•Systems Engineering is often not performed because:
–PM will not fund (viewed as “overhead”)
–Programs tend to be “back-loaded”, insufficient front-end funds
–PM voids contractor process maturity by tailoring critical itemsout of a program
–PM typically feels need to start coding/designing immediately
–Many major primes will not engage their subs in the top-level SE process (believing this to be sole responsibility of the prime)