2.2.2.3 Management Estimate at Completion - Most Likely. Enter in Block
6.c.1 the contractor's most likely EAC. This estimate is the contractor's
official contract EAC and, as such, takes precedence over the estimates
presented in Column (15) of Formats 1 and 2 and Blocks 6.a.1 and 6.b.1. This
EAC is the value that the contractor's management believes is the most likely
outcome based on a knowledgeable estimate of all authorized work, known risks,
and probable future conditions.
This value need not agree with the total of
Column (15) (Block 8.e). However, any difference shall be explained in Format
5 in such terms as risk, use of Management Reserve (MR), or higher management
knowledge of current or future contract conditions. The assumptions,
conditions, and methodology underlying this estimate shall be explained
briefly in Format 5. This EAC need not agree with EACs contained in the
contractor's internal data, but must be reconcilable to them. The most likely
EAC shall also be reconcilable to the contractor's latest statement of funds
required as reported in the
Defines standard
Replaced/Superseded by document(s)
Cancelled by
Amended by
File | MIME type | Size (KB) | Language | Download | |
---|---|---|---|---|---|
CONTRACT PERFORMANCE REPORT (CPR).PDF | application/pdf | 39.76 KB | English | DOWNLOAD! |
Provides definitions
Introduction
his report consists of five formats containing data for
measuring contractors' cost and schedule performance on Department of Defense (DoD) acquisition contracts.