Welcome to our new site version. Your web page bookmarks may have changed, please search for pages by title to update them. Having problems ? Please try clearing your web browser cache and hard-reloading your web page first before contacting our webmaster.

DID- Contractor's Standard Operating Procedures

[document] Submitted on 10 May, 2018 - 21:25
Keywords contractor operating procedures contractor standard operating procedures

Requirements

1. Format. Contractor format is acceptance.

2. Media Requirements. The Standard Operation Procedures (SOP) shall be in the digital data format as specified in the contract.

3. Content. Standard Operating Procedures (SOPs) shall be presented for each functional element of the mission to be performed. The SOPs shall contain all applicable information for the following:
a) receipt
b) storage and core of material issue
c) location survey
d) shipping inventory
e) safety transportation deliveries
f) training requirements

Metadata
Document identifier
DI-MGMT-81580
Date published
1999-08-09
Language of Attachment(s)
English
Document type
Data Item Description (DID)
Pages
1
Replaced/Superseded by document(s)
Cancelled by
Amended by
File MIME type Size (KB) Language Download
DID- Contractor's Standard Operating Procedures.PDF application/pdf   224.23 KB English DOWNLOAD!
File attachments
Cover images
Introduction

Use, Relationship: This Data Item Description (DID) contains the format and content preparation instructions for the data generated by the specific and discrete task requirements as delineated in the contract.

Organisation(s)
Defines standard
Visit also