DID- Equipment Inspection and Testing Report

Keywords equipment inspection testing report

Requirements:
1. Reference documents. None.

2. Format:
The report shall be in contractor’s format.

3. Content:
The Equipment Inspection and Testing Report shall be prepared from accept/failure data collected during equipment qualification and/or production testing. The report shall contain the following:
3.1 Title page the contains:
3.1.1 Report title
3.1.2 Equipment nomenclature
3.1.3 Report date

Metadata
Document identifier
DI-NDTI-81583A
Date published
2006-11-21
Language
English
Document type
Data Item Description (DID)
Pages
2
Defines standard
Replaced/Superseded by document(s)
Cancelled by
Amended by
File MIME type Size (KB) Language Download
DID- Equipment Inspection and Testing Report.PDF application/pdf   224.57 KB English DOWNLOAD!
File attachments
Cover images
Introduction

Use/relationship:

The Equipment Inspection and Testing Report contains the results of all equipment receiving acceptance inspection and testing and Environmental Stress Screening (ESS) and/or qualification testing.
The report is used to evaluate accept/reject rate during acceptance testing, ESS and/or qualification and corrective actions taken.

This Data Item Description (DID) contains the format and content preparation instructions for the data product generated by the specific and discrete task equipment for this data included in the contract.

This DID supercedes DI-NDTI-81583.

Organisation(s)
Visit also