Engineering Release Record (ERR)

Keywords Engineering Release Record engineering release records engineering release
Standards groups

1. Reference documents. The applicable issue of any documents cited herein, including their approval dates and dates of any applicable amendments, notices, and revisions, shall be as specified in the contract.

2. Format and content. The ERR shall be prepared in contractor format. The ERR content shall be in accordance with the contractor’s processes and procedures, or as specified in the contract. Delivery media is to be in accordance with the Integrated Data Environment (IDE) Concept of Operations (CONOP) specified in the contract.

3. Distribution statement. The appropriate distribution statement shall be affixed to the ERR in accordance with the requirements of the contract.

4. ERR NO. Provide the unique ERR identification number or the number assigned by the Government.

5. Procuring Activity Number (PAN). Provide the PAN of the procuring activity, if known (Army only).

Metadata
Date published
2000-09-30
Document type
Data Item Description (DID)
Pages
4
Defines standard
Replaced/Superseded by document(s)
Cancelled by
Amended by
File MIME type Size (KB) Language Download
DI-CMAN-80463C.doc application/msword   83 KB English DOWNLOAD!
File attachments
Visit also