Process and Product Quality Assurance (PPQA) for NASA Ames Research Center

Keywords Process and Product Quality Assurance for NASA Ames Research Center INSTITUTIONALIZING CHANGE IN AEROSPACE PROCESS AND PRODUCT SETTINGS cmmi made practical
Standards groups

CMMI has its origins in software engineering dating back to the late 1980’s
NASA had sufficient experience in CMM/CMMI when it was made as a requirement in 2004, which wasn’t and still isn’t the case for Six Sigma)
CMMI is essentially the de-facto model for improvement within the professional software community
CMM/CMMI was the recommended model for improving NASA software Aerospace Safety Advisory Panel (ASAP) and was approved by NASA HQ

Metadata
Date published
2011-04-12
Document type
conference presentation
Pages
23
Defines standard
Replaced/Superseded by document(s)
Cancelled by
Amended by
File MIME type Size (KB) Language Download
159.pdf application/pdf   1.68 MB English DOWNLOAD!
File attachments
Cover images
Visit also
External links