Keywords
lisa pathfinder
design interface
requirements specification
Interface Requirements Specification
Standards groups
LISA Pathfinder
This section defines the mechanical environments, which the units and their GSE will be subjected to during normal ground operations.
The ground operation phase begins with the units manufacturing and ends before launch. It includes all the manufacturing, assembly, integration and verification (AIV) and storage activities.
The units, the transportation equipment and MGSE are exposed to dynamic loads during the required transportation modes (road, air,...) and handling operations.
Defines standard
Replaced/Superseded by document(s)
Cancelled by
Amended by
File | MIME type | Size (KB) | Language | Download | |
---|---|---|---|---|---|
S2.ASU_.RS_.2031.pdf | application/pdf | 4.26 MB | English | DOWNLOAD! |