Who's Cross about Crossrail

Keywords Who's Cross about Crossrail predictions control technology complex engineering system
Standards groups

What went wrong? - Signalling
• Signalling required the integration of three separate systems:
• West of Heathrow and east of Stratford, the train uses Network Rail legacy
systems with safety enhancements
• The section between Paddington and Heathrow uses the European Train Control
System (ECTS)
• The central (tunnel) section uses a modern communications-based train control
system

Metadata
Date published
2019
Document type
conference presentation
Pages
18
Defines standard
Replaced/Superseded by document(s)
Cancelled by
Amended by
File MIME type Size (KB) Language Download
2019-Patrick_Weaver.pdf application/pdf   3.44 MB English DOWNLOAD!
File attachments
Visit also
External links