Assuring MMIS Integration for Shin Kori 3&4

Keywords assuring mmis integration for shin kori
Standards groups

Proactive approach to integration was required due to:

Overall complexity and scope of the SKN 3&4 MMIS
Use of diverse technologies to address common cause failure
Integrated System Engineering Team established early in the project;
Integrated System Engineering Lead
Integration Process Lead
Integration leads from platforms and systems
Integration Test Lead
Westinghouse Quality Procedures now include an Integrated System Engineering Process

Metadata
Date published
2011-05-11
Language
English
Document type
presentation
Pages
13
Defines standard
Replaced/Superseded by document(s)
Cancelled by
Amended by
File MIME type Size (KB) Language Download
2011-05-26 Assuring Integration on SKN 34.pdf application/pdf   2.07 MB English DOWNLOAD!
File attachments
Cover images
Introduction

Requirements Management (RM) plan developed to:
Ensure requirements issues are identified early
Implement requirements traceability for safety system software per industry standards
Link requirements for design and Verification & Validation

Author(s)
Daryl Harmon and Nancy Roseberry