Keywords
DoD
Systems Engineering for Rapid Prototyping: Friendly Marking Device
Standards groups
? Originating Requirements
? Weight : 4 – 6 oz without batteries
? Volume : 25.1 in3 , “Less than a Coke can “
? Critical operational issues (COI)
? The JTAC carries a variety of mission equipment to execute a
mission. The JTAC has limited excess space and weight capacity
for carrying new mission equipment.
? Measures of effectiveness (MOE)
? Solution shall be capable of being carried by a JTAC outfitted with
a typical complement of mission equipment.
? Measures of performance (MOP)
? Weight of the solution including packaging and expendables.
? Volume of the solution including packaging and expendables.
Defines standard
Replaced/Superseded by document(s)
Cancelled by
Amended by
File | MIME type | Size (KB) | Language | Download | |
---|---|---|---|---|---|
NDIA SE 06 - FMD_Brief.pdf | application/pdf | 740.47 KB | English | DOWNLOAD! |
Provides definitions
Organisation(s)
Publisher
NDIA