Keywords
Tracking Report for Equipment Modification
material change
change proposal
requirements
Standards groups
The purpose of this report is to provide an instrument for the Government to track implementation of an Engineering Change Proposal/Material Change/ Modification Work Order (ECP/MC/MWO).
This report will permit the Government to track contractor’s modification of government equipment.
This DID contains the format and content preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract.
This DID is applicable for a periodic report of the progress on an EXP/MC/MWO action involving the field retrofit of government equipment.
Defines standard
Replaced/Superseded by document(s)
Cancelled by
Amended by
File | MIME type | Size (KB) | Language | Download | |
---|---|---|---|---|---|
DI-CMAN-81018.doc | application/msword | 42.5 KB | English | DOWNLOAD! |