Tracking Report for Equipment Modification

Keywords Tracking Report for Equipment Modification material change change proposal requirements
Standards groups

The purpose of this report is to provide an instrument for the Government to track implementation of an Engineering Change Proposal/Material Change/ Modification Work Order (ECP/MC/MWO).

This report will permit the Government to track contractor’s modification of government equipment.

This DID contains the format and content preparation instructions for the data product generated by the specific and discrete task requirement as delineated in the contract.

This DID is applicable for a periodic report of the progress on an EXP/MC/MWO action involving the field retrofit of government equipment.

Metadata
Document identifier
DI-CMAN-81018
Date published
1989-09-27
Document type
Data Item Description (DID)
Pages
2
Defines standard
Replaced/Superseded by document(s)
Cancelled by
Amended by
File MIME type Size (KB) Language Download
DI-CMAN-81018.doc application/msword   42.5 KB English DOWNLOAD!
File attachments
Visit also