Integrated Support Plan (ISP)

Keywords Integrated Support Plan (ISP) support plan
Standards groups

Reference Documents. The applicable issue of the documents cited herein, including their approval dates of any applicable amendments, notices, and revisions, shall be as specified in the contract.

General. The Integrated Support Plan (ISP) shall document the contractor’s management plans for gathering and analyzing data; management, control and execution; integration and interface of the Integrated Logistic Support (ILS) Program task(s) delineated in the contract. The contractor’s management plans shall demonstrate that the new system or equipment, when fielded, will satisfy all supportability criteria.

Format and Content. The format and content requirements for the Integrated Support Plan (ISP) shall be as follows:

Sections. The ISP shall contain all sections identified in this paragraph even if there are no data or narratives required for a section or element ((e.g., if there are no tasks, requirements or other standards, the contractor shall enter “NOT APPLICABLE” and state the reason(s) (e.g., “NOT REQURED BY CONTRACT”).

Metadata
Document identifier
DI-ILSS-80395
Date published
1987-08-03
Document type
Data Item Description (DID)
Pages
5
Defines standard
Replaced/Superseded by document(s)
Cancelled by
Amended by
File MIME type Size (KB) Language Download
DI-ILSS-80395.doc application/msword   43.5 KB English DOWNLOAD!
File attachments
Visit also