a. Site layout plans showing location and configuration of all existing facilities plus location, configuration, and installation details of all equipment and facilities installed by the contractor. New equipment facilities shall be easily distinguishable from existing facilities. Important dimensions shall be given.
b. Floor plan and equipment layouts showing Location and configuration of all existing equipment plus location configuration and installation details of all equipment installed by the contractor. New equipment shall be easily distinguishable from existing equipment. The floor plans shall also show all significant obstructions and include important dimensions.
c. Layout and installation details of contractor-installed cable trays, ladders, and ducts.
Defines standard
Replaced/Superseded by document(s)
Cancelled by
Amended by
File | MIME type | Size (KB) | Language | Download | |
---|---|---|---|---|---|
DI-MGMT-81118.doc | application/msword | 67.5 KB | English | DOWNLOAD! |