Level of Repair Analysis (LORA) Program Plan

Keywords Level of Repair Analysis Program Plan program plan
Standards groups

This plan identifies and describes the contractor’s LORA program; how, when, by whom, and on what LORA will be conducted. This plan also describes the specific techniques to be used and tasks to be performed along with their development and integration into the overall LSA program and other related programs.

The principal uses fro this plan are to provide the government a basis for review and evaluation of the contractor’s proposed LORA program and it’s proposed components; for establishing contractual LORA compliance requirements; and, for providing the milestone schedule or study plan schedule indicating when the LORA will be initiated and completed.

This plan is the basic tool used to establish and execute and effective LORA program. When submitted as a response to a solicitation document, it is used in the source selection process.

Metadata
Document identifier
DI-ILSS-80654
Date published
1988-07-29
Document type
Data Item Description (DID)
Pages
4
Defines standard
Replaced/Superseded by document(s)
Cancelled by
Amended by
File MIME type Size (KB) Language Download
DI-ILSS-80654.doc application/msword   40.5 KB English DOWNLOAD!
File attachments
Visit also