A Comparison of PRINCE2 against PMBOK

Keywords PMBOK PRINCE2 project management
Metadata
Date published
2002-01-24
Language
English
Document type
technical report
Document type
tables
Pages
23
Defines standard
Referenced standards and/or methodologies
Replaced/Superseded by document(s)
Cancelled by
Amended by
File MIME type Size (KB) Language Download
P2_and_PMBOK_at_270202.doc application/msword   66 KB English DOWNLOAD!
File attachments
Introduction

This comparison takes each part of the PMBOK and gives an opinion on what match there is with elements of the PRINCE2 method. It can be used in any discussion of the level of compatibility between two approaches, or can be used to identify where additional material is required to be added or changed to training in one or the other in order to cover both approaches.

Visit also
External links